Строительное оборудование, сверхпрочный демонтаж, сортировка, гидравлический грейфер

Share on (1600346978057):


Price:

Quantity:


Product Overview

Description



Related Products


_01.jpg


 


















Product Display


construction equipment heavy-duty demolition sorting use hydraulic rock grapple grab


Custom as customer's special requirement


Suitable for handling yellow sand, stone, cement and clinker bulk cargo with specific gravity of 1.2-1.6t/m3. Related data as below for reference.








































































































































































































































































 
Crane lifting capacityt5,06,38,010,012,516,020,025,032,040,050,0
Grab Volume (40°dome)2,53,24,15,26,58,310,112,816,020,024,5
Dead weight4-foldt1,92,42,93,54,45,57,48,811,914,918,8
5-foldt2,02,53,03,64,55,77,69,012,215,219,2
DimensionsAmm25202750310033003510382042204390475052005700
Bmm30603320368039804230463050805320581063306870
Cmm22602480266029103160336036003920421045604910
Dmm25602730309032803500382040304320459049104380
Emm18301950223023102430261028003060326035503820
amm300380480480480590590670755850955
bmm650780900900900110013001280130014501550
Closing rope stroke4-foldmm602066007120780084009200976010720114801236013040
5-foldmm752582508900975010500115001220013400143501545016425
Standard diameter of closing ropesmm1618202224262832364044
Closing rope-total length to operate4-foldm10,811,812,914,115,316,818,119,120,922,824,6
5-foldm13,414,615,917,518,920,822,523,725,928,330,6
Dianmeter of closing rope sheavesmm280355450450450560560630710800900

 


 H3732f90af9d24359bafd9b21b92dc839l.jpgHe2445459e0a64d7a9cf21be18c0cb942G.jpgHa54f7c66f06d4f85b76f8cf09c13a5bcP.jpg





Company Information


_07.jpg_08.jpg_09.jpg All grab that we provide, we promise:

























 
Technic support1, customized design team communicate with customer
2, customer's special need will take into account during design and produce
3, communicate well and find the best suitable solution
Quality control  (3tests before delivery)1,Test the parts of the test-bed to test the reliability of components before installation
2,  hour no-load test of the grab, check the pressure and temperature holding performance of the hydraulic system and various performance data of the grab
3,The grab shall be tested continuously for 8 hours with load to detect the temperature control of the grab and the stability under continuous load (three consecutive days if necessary)



0.1944 s.