geto aluminum formwork Fast construction time concrete wall forms for sale with building metal materials

Share on (1600369809275):


Price:$10.00-15.00

Quantity:


Product Overview

Description





































Place of OriginCN;JIN
Model NumberGETO 6061-T6
Brand NameGETO
MaterialAluminum 6061-T6
WeightAverage 25-28KG/SQM
ColorSilver White










Lightweight energy saving silicone rubber mold for concrete building house

Lightweight energy saving silicone rubber mold for concrete building house

Assembled monolithic structure concrete paving stone mold floor plate

Assembled monolithic structure concrete paving stone mold floor plate

Fast construction time concrete cube mold with butt weld

Fast construction time concrete cube mold with butt weld

Accurate connection cheapest roman pillars concrete mold for sale by manual welding

Accurate connection cheapest roman pillars concrete mold for sale by manual welding

Automatic welding concrete gutter mold with butt weld

Automatic welding concrete gutter mold with butt weld

Cost effective concrete road barrier mold building structural unit

Cost effective concrete road barrier mold building structural unit

Acceptable quality concrete wood mold with column bracing

Acceptable quality concrete wood mold with column bracing

Automatic welding concrete pipe making mold with frame structure

Automatic welding concrete pipe making mold with frame structure

New 6061-T6 aluminium alloy raw material new design concrete baluster mold with OEM & ODM service

New 6061-T6 aluminium alloy raw material new design concrete baluster mold with OEM & ODM service




 











Raw materials



Cutting



Hole processing



Auto welding



Brushing



Coating



Barcoding of panels



Packing















sorting



product



product



product














Q:What is your MOQ?

A:Generally speaking, our MOQ is 500 square meter, which varies with different products.



Q:Can I use this set of formwork to another project?

A:Yes, there are nearly 70% standard panels can be common used.



Q:What's your packing methods?

A:Protection foam+heat contracted plastic film. / wooden packing(non-fumigation) / Metal pallet or depend on clients special requirement.



Q:How to proceed an order for aluminum formwork?

A:1- All your drawings send to us.    2- After analyze by our engineer and designer, we have a meeting for discussing details.    3- Construction details confirmed, contract signed.    4- Modeling.    5- Have meeting for confirming model details.    6- Production.    7- Acceptance check.    8- Ship.



Q:Do you have pre-mocking up service?

A:Yes, we have pre-mocking up service, it depends on customer, sometimes, our clients need the cargo urgently, then they do not need pre-mocking up, normally, we will do pre-mocking up to our customers.



Q:If I don't have people know well about your forwmork system, what can I do?

A:Well, we will send two or more technicists to your construction site for guidance.

.png






 



0.1843 s.