REDSTAR Wet PP/PE Pelletizing Extruder PP/PE Plastic Woven Bag Dryer Film Squeezing Machine

Share on (1600375747659):


Price:$38,000.00 - $40,000.00

Quantity:


Product Overview

Description



Product Description


film bale shredderfilm bale shredderfilm squeezerfilm squeezerfilm squeezerfilm squeezer



Product Detail





















Blade materialSKD-11
ColorClients
Capacity1500kg/hr


This rock single shaft plastic shredder is new designed especially for crushing packaging film, woven bag, jumbo bag, wood pallets and so on which the normal crusher can not handle. The shredder have the advantages of stable running lower noise and big capacity.The materials are pushed into the shredding chamber by hydraulic. Independent drive system and solid structure make the running stably.


Feature:


1. It adopts PLC control system, automatic overload protection and auto reverse switch


2. Good shaft structure design, low noise, blades easy changeable


3. The low rotation speed results in a particularly quiet shredding process with low levels of dust generation







Packaging & Shipping



Vibrator




Company Information



Vibrator






Our Advantages



Vibrator






Exhibition



Vibrator






Workshop



Vibrator






Packaging & Shipping



Vibrator






FAQ





1) What's your guarantee or the warranty of the quality if we buy your machines?


We offer you high quality machines with 1 year guarantee and supply life-long technical support. 




2) When can we get my machine after we paid?


Normally production time is around 30-45days,the exactly depend on what kind of machine you order.The shipping time is based on your destination port.




3) How to install my machines when it arrives?how much the cost?


We will send our engineers to your factory to install the machines and train your staff how to operate the machines.


Customer pay air tickets go and back,accommodation and USD80/day/person.




4) How long time for installation?


According your machines order,we will send one or two engineers to your plant,it will take about 10 days to 25 days.




5) How about the spare parts?


We will send one year enough easy broken spare parts together with the machines,shipping together.During the warranty time,we will supply the spare parts with our cost including the delivery fees.









0.1969 s.