Production Capacity 18000 PCS/ hr Disposable Latex and Nitrile Gloves Production Line

Share on:


Price:
Price in USD:Details

Quantity:


Product Overview

Description





Product Description






Pre-sale Help
1. TONGYI COMPANY supports the client to pay by instalments.
2. All of accessories will be prepared at seller’s factory, the body of the production line can be bought from local market in order to cut client’s cost. It will take 90 days to prepare all accessories for the production line.
3. When all of parts have delivered to the client’s factory, we will arrange 2~3 engineers to guide the installation, there are of the 5-6 experienced mechanical workers from client’s side to help the installation. After finishing installation, 2 training engineers will take charge of workers’ train. The whole of process will spend 60 days on installation and train.


Nitrile latex glove making production machine
The nitrile/latex glove production line uses natural latex or synthetic rubber as the main raw material and other chemicals as auxiliary materials. The hand mold is cleaned with acid and alkali, and then cleaned with water again. Then the cleaned hand mold is first immersed in hot water and heated then immersed into coagulant and dried for dipping. After dipping, go into an oven for preliminary drying, flushed with hot water and then sent to another oven for curing and drying to form. After the gloves are demolded, they are inflated or filled with water for inspection, washed.centrifuged. and dried before packaging and sending them to the finished product warehouse.


Our Advantages


3D Installation
Tongyi company supplies 3D installation drawing, which makes the process of installation more intuitive and easier.
Formula available
we promise to take out the formula free to order’s client in order to cut clients’ cost, we make sure every client
produce nitrile or latex gloves steadily and efficiently.


Product Paramenters


TYPE
Hand mold
Capacity(pieces/hr)
Size
Power
Latex Consumption
DY45
single
2400-3000
45x1.8x7m
About 75kw/h
About 0.7tons/day
DY50
single
3000-3600
50x1.8x8m
About 80 kw/h
About 0.8tons/day
DY80
single
8100-8500
80x1.8x8m
About 90 kw/h
About 1.8 tons/day
DY100
single
9600-10200
100x1.8x8m
About 120 kw/h
About 2.5 tons/day
DY110
single
29000-30500
110x1.8x12m
About 150 kw/h
About 6.6 tons/day
DY120
double
19000-21000
120x1.8x11m
About 120 kw/h
About 4.4 tons/day
DY140
double
15500-16500
140x1.8x8m
About 120 kw/h
About 3.5 tons/day
DY180
double
35000-40000
180x1.8x12m
About 150 kw/h
About 8.2 tons/day


Details Images








Installation Instructions










FAQ


Q1:How Long Is The Warranty Period?
A1:one year,the after-sales is long life.
Q2: How About The Installation? Do You Have After-Sales Service?
A2: A:We will provide the installation video and manual.we also can send the professional technician to your company to install the machine and train your staff until they could operate the machine independently.
Q3: What Should We Prepare Except Material?
A3 You should prepare workshop, water line, electric line, compress air (if you need, we can help you buy air compressor). We can supply workshop layout drawing according to your workshop.
Q4: How long is the delivery time?
A4 the delivery time is 90days, the client can choose the installment




0.0256 s.