Share on:
Bioevopeak BA-SA-100C Semi-Auto Biochemistry Analyzer
Model | BA-SA-100C |
Test method | 1 point end, 2 point end(Sample blank), Kinetics, Fixed-time, Coagulation(optional). |
Optics | 7 standard filters: 340nmz 405nm, 450nm, 505nm, 546nm, 578nm, 630nm. 2 more for optional. |
Lamp house | Long-life tungsten halogen lamp(6V/10W), auto-sleep function. |
Display | 7.0″ TFT LCD with touch screen, 800*480 pixels. |
Printer | Build-in thermal printer, 57mm printer paper. |
Temperature | 25,30, 37°C and Room temperature. By means of Peltier elements. |
Flow cell capacity & optical path | 32µL, 10mm |
Resolution | 0.0001 Abs. |
Photometric range | 0.0000-4.0000 Abs. |
CPU | ARM Cortex-A8, 720M Hz. |
Memory | DDR2 SDRAM: 1G bit; |
Flash | 256 MB; Over 300 programs, 200000 results can be stored. |
Interface | 4 USB Hosts, 1 USB Slave, 1 Ethernet port. USB port(host) for keyboard, mouse, printer, U disk, bar code reader etc. USB port(slave) for PC connection(support PC software control function). |
Operational environment | Temperature: 10°C~30°C, Humidity: 30%~80% |
Power requirement | Wide power supply AC 100-240V, 50/60 Hz |
Dimension | 400*300*160mm(L*W*H) |
Q: How about quality of the goods?
A:l All the running products comply with CE standards.
l Independent quality inspection team, conducting multiple inspections and random inspections from parts supply to product dispatch.
l Well-known third-party testing service available, such as SGS, BV, and TUV, etc.
Q: What are your pre- and after-sales services?
A:l Timely reply to pre-sales enquiries
l Real-time update of manufacturing and shipment status
l Contracted third-party maintenance company in over 60 countries
Assured availability of parts supply for 10 years at least
Q: Is OEM service available.
A: Most of the running products are available for OEM customization, including logo, package and function, if attainable, customization.
Q: How long is the lead time:
A: Generally, the lead time for most stocked products is about 7~15 days, vary by models and production schedule. For those non-stocked products, the manufacturing lead time is around 20 days