Coconut Oil Production Line

Share on (1600416446970):


Price:$78,000.00

Quantity:


Product Overview

Description


Coconut Oil Production Line


1. Why choose us?


FOTMA is the leading and professional supplier in China for oil press machine!
FOTMA has over than 17 years experience with oil press machine!
FOTMA can supply the best price and professional service!
FOTMA has good reputation with all world customers!
FOTMA is 13 year Gold Member at Made In China!
FOTMA is 15 year Gold Member at Alibaba!


 


2. Product description


Coconut oil or copra oil, is an edible oil extracted from the kernel or meat of mature coconuts harvested from the coconut palm (Cocos nucifera). It has various applications. Because of its high saturated fat content, it is slow to oxidize and, thus, resistant to rancidification, lasting up to six months at 24 °C (75 °F) without spoiling.


 


3. Technological process introduction:


(1) Cleaning: remove shell and brown skin and washing by machines .


(2) drying:  putting clean coconut meat to chain tunnel dryer ,


(3) Crushing:  making dry coconut meat to suitable small pieces 


(4) Softening: The purpose of softening is to adjust the moisture and temperature of oil, and make it soft.


(5)  Pre-press: Press the cakes to leave oil 16%-18% in the cake. The cake will go to extraction process.


(6)  twice press: Press the cake till the oil residue is about 5%. 


(7) filteration: filtrating the oil more clearly then pump it to crude oil tanks 


(8) refined section: dugguming$neutralization and bleaching ,and deodorizer  , in order to improve the FFA and the quality of oil  ,extending the time of storage .


 


4. Technical parameters




















No.



Workshop Name



Model



QTY.



Power(kw)



1



Extrude Press Workshop



1T/h



1 Set



198.15



 

Material’s requirement index























Project



Coconut



Temperature



280 degree



Residual oil



About 5%



Leave oil



16%-18%



 



5. Photos


Coconut Oil  Line(1).pngCoconut Oil  Line(3).pngCoconut oil  line(5).png 


 


5. Packing and Shipping:
(1) Packing: Usually in the wooden cases for main machines and carton boxes for small parts.
MNSL9000A Vertical Emery Roller Rice Whitener
(2) Delivery:
Usually in 5-45 days after payment, it depends on the model and order quantity. For small packages, we can choose delivery by air(Normal air or courier: DHL, TNT, UPS, FedEx, etc.). For large machines, we can arrange to ship by water( LCL or FCL, bulk cargo or RO/RO), train or truck.


6. Our Factory
Workshop (2).jpg


 


7. Certificates
MNSL9000A Vertical Emery Roller Rice Whitener


 


8. Customer Visiting
MNSL9000A Vertical Emery Roller Rice Whitener


 


9. Installation site:
Installation (1).jpg


 


10. Why choose FOTMA?


1.For more than a decade, with its excellent production technology and high-quality after-sales service, it has always been recognized and loved by users.

2.Obtained many official promotion appraisals and won many national patents. The technology is continuously updated, the products are mature and reliable, and the technology always leads. 

3.High oil output, clean and pure oil, good market efficiency. Original automation, intelligent technology, automatic electronic temperature control function, energy saving and high efficiency. 

4.Original automation, intelligent technology, automatic electronic temperature control function, energy saving and high efficiency.

5.FOTMA can provide a full set of technical support and perfect after-sales service, which is the first choice of urban and rural oil mills and small and medium-sized refineries. 


11. Our Service:
---One year quality warranty for the machine and spare parts
--- Oversea engineers service for installation
--- Whole-life after-sales service and free consultation
---Customized requirements available
---Technician guide at the site.
---24Hr online service

MNSL9000A Vertical Emery Roller Rice WhitenerMNSL9000A Vertical Emery Roller Rice Whitener


 


12. FAQ
Q1:- Can we mix different models and accessories together? 
A:- You may mix different products or models in a single container but we would need to advise you on optimum loading and final capacity of your shipment. 

Q2:- How do I visit you and the factory? 
A:- You are welcomed to visit us and our factory at your convenience. We can pick you up at airport or train station and bring you to our factory . Let us know your schedule in details so we can arrange everything for you. Normally you need 3 days for an adequate visit to our factory. 

Q3:- How can I become a dealer in my area? 
A:- If you are qualified, you may apply for a dealership. We choose reliable partners for a long term business cooperation. 

Q4:- Can I get an exclusive right for your machines in some territories? 
A:- It depends on which country you are in. We have exclusive agents at several countries at this time. Most countries you can sell freely. 

Q5:- After payment, how long will it take to get the machines we order? 
A:- Normally 30-90 days after your payment (15-45 days for manufacturing, 15 - 45 days for delivery and shipment on sea) 


Q6:- I knew nothing about these machines, what kind of machine I should choose?
A:- Very easy. Let us know your idea about the capacity or budget, you will also be asked some easy questions, then we can recommend you good models according to the information.

Q7:- What is your warranty period?
A:- Our company offer 12 months warranty since goods arrival at destination. If there is any quality problem which caused by material or workmanship fault during the warranty period, please contact us directly and we'll supply free spare parts for replacement.

Q8:- What is the warranty range?
A:- The quality problem which caused by material or workmanship fault will be covered by warranty. The wearing parts and electric device are not included in warranty rangeAny troubles and damages that caused by misplacement, misuse, improper operation, poor maintenance and non-compliance with seller's instructions will however be excluded from the guarantee.

13. Contact us
Ms. Danni Feng
Hubei FOTMA Machinery Co., Ltd
Add: No. 52 Guanggu Avenue, New High-tech Development Zone, Wuhan city, Hubei Province, P. R. China.   


 


 


0.2131 s.