Share on (1600425002519):
2022 Top Sale New Design BP Machine Blood Pressure Meter Tensiometer Buy Digital Pulsewave Upper Arm Blood Pressure Monitor Old
| Product Feature | |
| Product Name | LED Curved Screen Upper Arm Blood Pressure Monitor Tensiometro Electric Digital Blood Pressure Monitor BP Monitor Blood Pressure |
| Measurement Methods | Oscillometric method |
| Measuring Location | Upper arm |
| Measuring arm circumference | 22~42cm |
| Measuring range | Pressure:0-299mmHg Pulse:40-199 pulses/min |
| Measuring accuracy | Pressure: ±0.4kPa/±3mmHg Pulse: ±5% of reading |
| Inflation | Automatic by micro air pump |
| Deflation | Automatic electronic control valve |
| Memory function | 2*199 group memories |
| Automatic power off | In 3 minutes after using |
| Power Source | 4xAAAalkaline batterries |
| Operating Environment | +5℃ to +40 ℃ 15% to 85%RH |
| Storage Environment | -20℃ to +55℃ 10% to 85%RH |
| Way of use | Fully automatic one-button measurement |
| Key words | blood pressure monitor; digital bp monitor; bp machine; sphygmomanometer |
Features:
1. Intelligent pressure control Technology;
2. Big LED display;
3. 2*199 groups memory;
4. Irregular heart beat detection function (IHB function);
5. Date and time function;
6. Average function for the last 3 times measurement value;
7. Blood pressure classification indicator (WHO function);
8. Measuring Range: Pressure: 0mmHg~299mmHg; Pulse: 40~199 times/min;
9. Measuring Accuracy: Pressure: ±3mmHg; Pulse: ±5% of reading.
10. Automatically inflate and deflate;
11. Automatic power-off function;
12.Human voice(optional)







Package For Portable Digital Blood Pressure Monitor wireless BP machine Includes:
1 x Blood pressure monitor
1 x Band Cuff
1 x user manual
1x gift box
NOTE: Batteries is NOT Included






100% quality inspection
We have a professional quality control team in every production process.
1:IQC material testing
Prior to assembly is quality control and all materials are inspected by IQC.
2: Perfect inspection process
There are 12 product testing processes, which is the most inspective process in the industry, ensuring the quality of each product.
3: Semi-finished QC
QC is an appearance quality check, including attachment inspection.
4: Finished product inspection QC.
After the product is assembled, QC Dutys will check all product functions at the production line and check at the quality department.
5: dysfunction rate QC
The dysfunction rate is within 3‰, and the overall after-sales rate of the data for the whole year of 2015 is less than 1‰.
After sales and returns
After sale
1) If you have any questions about our products or policies, please contact us by email and we will get back to you within 24 hours.
2) You can't get satisfaction from negative feedback, and we can't improve from it. Therefore, before leaving any negative feedback, it is best to contact us for a solution. We will try our best to solve it for you.
Return
1) All products are guaranteed for two years. If the product you receive is defective, we will replace it for you at no charge.
2) If you contact us to find out more about the return process and make sure everything goes well, please return the goods to us.

Q1: Are you a trader or a manufacturer?
A1: We are an industry and trade integrated enterprise. The company has its own factory and production line to ensure stable quality and shipments. Since we are an industry and trade company, we can guarantee that our prices are very competitive and cost effective.
Q2: How is the quality of your factory?
A2: We have strict process control system for raw material control, process control and finished product quality. The finished products will be inspected in the production line before packaging.
Q3: Can you provide OEM or ODM service?
A3: Yes, we have strong developing team and R&D team to support OEM and ODM service. The products can be made according to your request.Our MOQ is 1000 piece only,so your small order is acceptable.
Q4: What is the sample lead time and production lead time?
A4: The stock sample 5 day, making sample 7~10 days after received your sample fee. The production lead time is about 40 days based on MOQ.
Q5: What are your payment terms and terms of the transaction?
A5: T / T 30% is prepayment, 70% is before delivery. We will show you photos of the products and packaging before you pay the balance.
Q6: How’s the production efficiency of your factory?
A6: We have large professional workers. And we can make 10,000 pieces per day.
New products from manufacturers at wholesale prices