ABB Factory Automatic Palletizing Robot Palletizer Industrial Robot Packaging Line Ordinary Product Case Bearing,plc Pneumatic

Share on (1600426119376):


Price:$49,896.00

Quantity:


Product Overview

Description



Products Show




One set of robot gripper, for carton. The magnetic valve is controlled by the robot process to drives cylinder move and the stainless steel gripper putting the bags on the pallet orderly.
One set of robot gripper, for bag . The magnetic valve is controlled by the robot program to drives cylinder move and the stainless steel gripper putting the bags on the pallet orderly.
One set of sucker gripper, for carton ,When the sucker is on the carton, it will be controlled by the robot process to put the sucked cartons on the pallet orderly.


Products Description


Product Name
automatic robot palletizer machine
Packing Material
Wood
Compressed air pressure
0.5-0.7 Mpa
Stacking speed
400-500/600-700 bags / hour
Transportable weight
140kg-450kg
PACKING CAPACITY
600-1200 bags/hour (depending upon the material)
Host Dimension
L3200*W2400*H3000mm
Power Supply
AC220V/380V, 50HZ, 1P/3P
BAG TYPE
Kraft Paper bags ,PP Woven bags
Relative Humidity
≤90% RH(Non-condensing)





High efficiency automatic robotic palletizer for stacking, palletizing robot, palletizer can be used in any production line, providing intelligent, mechanization for production site. It is a palletizing logistic system which can be used in the industries of beer, water, soft drink, milk, beverage and foodstuff etc. It is widely used for carton, plastic crate, bottle, bag, barrel, shrink wrapped product and can etc.


Project Display




Project in Philippine
Project in India
Project in Russia




Recommend Products






Certifications








Our Factory&Team














Packing & Delivery




FAQ


Q: Are you trading company or manufacturer ?
A: We are factory.

Q: Can you offer oversea service?
A: Engineers available to service overseas.

Q: How about the guarantee period?
A: One year whole machine guarantee.

Q: What is the lead time?
A: 15-30 days after received the deposit.


0.1984 s.