Bioevopeak 50-20000ml Digital Display Heating Mantle

Share on:


Price:
Price in USD:Details

Quantity:


Product Overview

Description


1111Bioevopeak 50-20000ml Digital Display Heating Mantle



Features




  • Product Description:


    1. PID Single Screen Temperature controller. Fast heating, temperature uniformity and high precise temperature control.


    2. Several Rows type, produce as Customer inquiry, beautiful shape, easy to operate and effective.


    3. PT100 Temperature sensor, with Adjustable Sensor Rack and Stainless Rods.




 





Specifications


 































































Model



HMD-1



HMD-2



HMD-5



HMD-10



HMD-20



HMD-40



HMD-60



HMD-100



HMD-200



HMD-400



Function


 


 


 



Capacity(ml)



50



100



250



500



1000



2000



3000



5000



10000



20000



Heating Mode



Surface heat-conduction



Structure


 


 


 

Shell(Insulation Layer)



High quality aluminum silicate cotton



Heating power (kW)



0.08



0.1



0.15



0.25



0.35



0.45



0.6



0.8



1.2



2.5



Controller



Working Mode



Continuous






Packaging & Shipping


sss 





Certificates


fff 





About us


-(1)(1)-01 





FAQ


Q: How about quality of the goods?


A:All the running products comply with CE standards.


Independent quality inspection team, conducting multiple inspections and random inspections from parts supply to product dispatch.


Well-known third-party testing service available, such as SGS, BV, and TUV, etc.


 


Q: What are your pre- and after-sales services?


A:Timely reply to pre-sales enquiries


Real-time update of manufacturing and shipment status


Contracted third-party maintenance company in over 60 countries


Assured availability of parts supply for 10 years at least


 


Q: Is OEM service available.


A: Most of the running products are available for OEM customization, including logo, package and function, if attainable, customization.


 


Q: How long is the lead time:


A: Generally, the lead time for most stocked products is about 7~15 days, vary by models and production schedule. For those non-stocked products, the manufacturing lead time is around 20 days


eee 




0.0136 s.