High quality Geothermal heat pump for heating cooling 7.5kw with CE certification

Share on:


Price:$999.00 - $1,299.00
Price in USD:Details

Quantity:


Product Overview

Description








Geothermal heat pump for heating cooling DHW

152879013900166.png








Advantages of Geothermal heat pump

152879014100235.png


 


1.Low energy cost with no pollution: The biggest benefits of GHPs system is that they use 25%-50% or less electricity then conventional heating or cooling system.


2.Free or reduced-cost Hot water: Unlike any of other heating and cooling system,a high cop heat pump water heater can provide free hot water. A device called a "desupper---heater"transfers excess heat from the heat pump's compressor to the hot water tank. In summer,hot water is provide free. In winter, water heating costs are cut roughly in half.


3.Year-Round Comfort: While producing low heating bills,high cop heat pump water heaters are quieter than conventional systems and improve humidity control, those features help explain shy customer surveys regularly show high levels of user satisfaction,usually well over 90 percent.


4.Saving money: For example,a home of 1,500 square feet,energy cost are about one dollar a day.


5,Multi-functions: five working modes can be selected freely. They are hot water, cooling, heating, hot water + cooling, and hot water+ heating.


6,The heat exchanger adopts advanced V design which raises the system heat exchanging efficiency about 30%.


7,Super performance with high COP.


8,Low noise.


9,Wide application: The combined system is widely applied in the commercial sector, suitable for office building, hotel, school, restaurant and etc.


10,High outlet water temperature up to 55 or 60 degree


 








Installation of Geothermal heat pump

TIM20181221163116.jpg


TIM20181221163315.jpg








Details of Geothermal heat pump

















































Heat pump typeGround source geothermal heat pump air to water 
ManufacturerGuangdong New Energy Group
Factory scale

with in total 3 factory in China,400,000 sq meters. 500,000 units producing ability, 100,000 units sold in 2016


Heat pump functionHeating&cooling&hot water
MOQ

10-20 Units(1-2 Sample available with stocks)


Suitable market 

Minus 30C stable Working Central, North & East Market, North America


Suit heating space

TYPE OF HEAT PUMP


ModelSuitable area
Geothermal heat pump 10.8kwNERS-G3S100M2
Geothermal heat pump 21kwNERS-G6S200M2
Geothermal heat pump 34kwNERS-G10S400M2

 








Specification of NEW ENERGY Geothermal heat pump for heating&cooling&hot water

TIM20181221165105.jpg



Packaging & Shipping



Packing Details : stable plywood box package,0.68 CBM for10KW, 1.15CBM for 20/22KW,1.96CBM for 30KW dc inverter heat pump all in one heat pump all in one heat Delivery Details : 1-25 working days after receiving payment by T/T, or alibaba trade assurance payment
Dealing Details: EXW factory, FOB Guangzhou/Shenzhen Port, CIF to destination Port, DDP Door to Door Service provided


Packing.jpg


Shipping.jpg 





Company Information


Nulite NEW ENERGY Technology Co.,Ltd












Located at Guangzhou City, is the China-Singapore Joint Venture established in 2003, with three main modern manufacturing factory covering 580,000 square meters, 1,200,000 units production ability and over 1,500 employees.
1196921












 


 


 


 





Our Services








Our customers and their feedback

1.jpg


For hige quality and performance air source heat pump, call me. 


 .png





FAQ


 








FAQ

Q1. What is your terms of packing?
A: Generally, we pack our goods in neutral cartons and polywood. If you have legally registered patent, 
we can pack the goods in your branded boxes after getting your authorization letters.

Q2. What is your terms of payment?
A: T/T 30% as deposit, and 70% before delivery. We'll show you the photos of the products and packages 
before you pay the balance.

Q3. What is your terms of delivery?
A: EXW, FOB, CFR, CIF, DDU.

Q4. How about your delivery time?
A: Generally, it will take 30 to 40 days after receiving your advance payment. The specific delivery time depends 
on the items and the quantity of your order.

Q5. Can you produce according to the samples?
A: Yes, we can produce by your samples or technical drawings. We can build the molds and fixtures.

Q6. What is your sample policy?
A: We can supply the sample if we have ready parts in stock, but the customers have to pay the sample cost and 
the courier cost.

Q7. Do you test all your goods before delivery?
A: Yes, we have 100% test before delivery

Q8: How do you make our business long-term and good relationship?
A:1. We keep good quality and competitive price to ensure our customers benefit ;
2. We respect every customer as our friend and we sincerely do business and make friends with them, no matter where they come from.




0.0108 s.