New produced heavy equipment loader gear box




CE certificate 5 ton wheel loader MR650B
Performance
| Rated load | 5000kg |
Overall weight | 17100kg | |
Rated bucket capacity | 3m3 | |
Maximum tractive force | 152KN | |
Maximum breakout force | ≥170KN | |
Maximum grade ability | 30℃ | |
Maximum dump height | 3120mm | |
Maximum dump reach | 1465mm | |
Overall dimension (L×W×H) | 8100×3070×3500mm | |
Minimum turning radius | 6640mm | |
Engine
| Model | Weichai Steyr WD615 |
Type | lnline water cooling dry cylinder injection | |
No. of cylinder-bore/stroke | 6-126×130mm | |
Rated power | 162kw--2400r/min | |
Maximum torque | 860N.m | |
Min fuel-consume ratio | ≤215g/kw.h | |
Transmission system
| Torque converter | Advance brand |
Gearbox mode | Power shift normally engaged straight gear | |
Gear shift | 2 Forward shift 1 Reverse shift | |
Maximum speed | 38km/h | |
Drive axles
| Main reducing spiral | bevel gear grade 1reduction |
Decelerating mode | planetary reduction,grade 1 | |
Wheel base (mm) | 3330mm | |
Wheel tread | 2260mm | |
Minimum ground clearance | 450mm | |
Hydraulic system
| System working pressure | 18MPa |
Boom lifting time | 5.95±0.2s | |
Total time | 10.95±0.5s | |
Fuel tank capacity | 300L | |
Function of leveling automatically | yes | |
Brake system
| Service brake | air over hydraulic disc brake on 4 wheels |
Parking brake | manual parking brake | |
Tires | Size | 23.5-25 |
Front tire pressure | 0.4Mpa | |
Rear tire pressure | 0.35Mpa |




FAQ
Is your machine specification data real?
Yes, 100% real, we never overstate, never use fake data to attract customers.
What is your payment?
Normally we can work on T/T or L/C.
What is Quality Control system?
Mountain raise 5 steps:
A, After order confirmed, we have a meeting with the main peoples who work for workshop before production,investigate all the workmanship and some technical problems, ensure all of them have related ways to settle and control.
B, Inspect all the materials when arrived, ensure they will be catched up customers's requirements.
C, Inspect the semi-finished goods.
D, Inspect the finished products.
E, Final inspection when pack up all the goods.if there is not any problems for this step,our QC will issue the inspection report and release this products.

New products from manufacturers at wholesale prices