hot sale large steel castings for punch and die tooling

Share on (1600445394391):


Price:$2,500.00 - $2,600.00

Quantity:


Product Overview

Description





Product Description


Product Name
top matrix tee
Material
ZG270-500,35JI GOST 977-88
Standard
DIN GB ISO JIS BA ANSI ASTM
Used
pipe fittings


C
Mn
Si
S
P
Chemical Composition
0.32-0.40
0.45-0.90
0.20-0.52
≤0.045
≤0.040
Tensile Strength
Yield Strength
Impact
Mechanical Property
491MPa
275MPa
34.3J






Machining




Company Profile




Production Facilities


No.
Equipment Name
Quantity(Set)
1
Transformer Substation
1
2
Full Set of Wooden Molding Equipment
10
3
Sodium Silicate Sand Mix Line
4
4
Alkaline Phenol Resin Sand Mix Line
2
5
25 Tons Electrical Arc Furnace
1
6
50 Tons Intermediate Frequency Furnace
2
7
120 Tons Refining Furnace
1
8
120 Tons VD Furnace
2
9
12m Heat Treatment Furnace
3
10
120 Tons Large-scale Shot Blasting Machine
1
11
150 Tons Travel Crane
2
12
125 Tons Travel Crane
3
13
200 Tons Travel Crane
2
14
CNC Gantry Boring and Milling Machine
2
15
2.5m-10m Digital Vertical Lathe
16
16
Boring and Milling Machine
13
17
Horizontal Lathe
3
18
Large Dust Removal Equipment
7


Inspection Equipment


No.
Equipment Name
Quantity(Set)
1
Sand Analysis Equipment
1
2
Impact Sample Low Temperature Meter
1
3
Direct Reading Spectrometer(OXFORD)
2
4
ONH Analyzer
1
5
ZEISS Metallurgical Microscope
1
6
Pendulum Impact Tester
1
7
Microcomputer Controlled Electro-hydraulic Servo Universal Test Machine
5
8
Various Hardness Tester
4
9
Magnetic Defect Detector
5
10
Ultrasonic Flaw Detector(Digital)
1
11
CX-52 Total Station
1
12
Stylus Roughness Meter
1


Certifications




FAQ
Q: What is good for an enquiry?

A: Material,quantity,mechanical property requirement and class certificate.

Approved drawing is needed for surveyor's inspection or the surveyor will refuse.
It is better on the drawing,chemcial composition and mechanical property is clearly shown on the drawing.

Q: How long is your delivery time?

A: Generally at least 4 months.

Every customer want us to be quick with less time.
But we should follow the production schedule and follow the surveyor's schedule.
No need for us to guarantee a short time,but in fact it will be absolutely delayed.
We will strictly obey the contract we sign with the customers.

Q: What is your terms of payment ?

A: 30% T/T, 70% before shipment after customers' inspection or 30% down payment,70% L/C


Product packaging




0.2229 s.