Share on (1600446902243):

Basic information:
| Product Name | OEM High Precision Die Casting Zinc & Aluminum Metal Die Casting Mold Die Cast Parts Mold Maker Die Casting Tooling |
| Mould Material | P20/718/738/NAK80/S136/2738/2316/H13, etc. |
| Mould Cavity | Single Cavity & Multi - Cavity . |
| Material | Aluminum Alloy ADC12,A360,A380 or customized. |
| Drawing format | IGS, STEP, SLD, X_T. DXF.DWG. SAT. STL. |
| Surface Treatment | Anodizing, Sandblasting,Powder Coating,Polishing.Painting, Brushing,Galvanizing,Chrome plating,etc. |
| Process | Drawing&Samples→Mould making→Die casting→Deburring-Drilling and threading→ CNC Machining→Polishing→Surface treatment→Assembly→Quality inspection →Packing→Shipping |
| Deep processing | CNC/ Cutting / Punching/ Checking/ Tapping/ Drilling /Milling |
| Application | Led light housing & Led Heatsink |
| Auto motocyle & bicycle parts | |
| Furniture accessories | |
| 5G housing | |
| Mechanical parts | |
| Pump housing | |
| Advantage | We have three factories. We have a professional R&D team. We have more than 18 years experience in die casting field. |
Relevant information:
| MOQ | Mould MOQ is 1 set,Mass product depend on the detail. |
| Mould produce time | 35-45days for sample including tooling time. |
| product lead time | normally about 30 days for mass production, also depend on your quantity. |
| payment terms | T/T, alibaba trade assurance. |
| Delivery Method | By Express Courier, such as DHL, Fedex,UPS, TNT, EMS etc.;by air, by Land or by Sea; |
| Port of loading | Shenzhen port / Shekou port/Yantian port. |
Some pictures of this mold:


Q1. Are you a factory or trade company?
We have three factories,The factory headquarters is located in Guangdong China,Welcome to visit our factory.
Q2. What kind of production service do you provide?
Mold making, Aluminum/zinc die casting,Heat sink,Aluminum Extrusion,Gold forging,heat pipe and cooling fans.
Q3. How about the lead time?
Mold and sample: 3-5 weeks
Mass production: 2-4 weeks
Q4. How about your quality?
♦We have got ISO9001:2015 and IATF16949 certificates.
♦We will make the operation instruction once the sample is approved.
♦We will 100% inspect the products before shipment.
♦Transactions can be through Alibaba's trade assurance.
Q5. How long should we take for a quotation?
After receiving detailed information(your 2D/3D/CAD drawings or samples,Material, Finish, and Quantity), we will quote you within 2 days.
Q6. What is your payment term?
Mold: 50%-100%prepaid.
Goods: 30% prepaid, balance T/T before shipment.
Q7. How soon can I get samples and how much the fee?
Depending on your specific project, it usually takes 15 to 25 days. the fee depends on the product drawing, and the fee will be returned to your bulk order.
Q8. How to enjoy the OEM services?
Usually, base on your design drawings or original samples, we give some technical proposals and a quotation to you, after your agreement, we produce for you.
Q9.Will my drawing safe after you get it?
A6: Yes, we can sign the NDA before got your drawing.
New products from manufacturers at wholesale prices