China Cheap Conveyor Belt Manufacturer For Cement

Share on (1600456380720):


Price:$18.00 - $21.00

Quantity:


Product Overview

Description



Products Description


✔ Chevron Conveyor Belt







Standards

                         Cover Rubber
Adhesion
Tensile Strength TD
Elongation at break
Abrasion
Cover to Ply
Cover to Ply
Ply to Ply

DIN 22102

Mpa

%

mm3
N/mm
N/mm

N/mm
(≤1.5mm)
(>1.5mm)
DIN 22102-Z
15
350
250
3.5
4.5
5
DIN 22102-W
18
400
90
3.5
4.5
5
DIN 22102-Y
20
400
150
3.5
4.5
5
DIN 22102-X
25
450
120
3.5
4.5
5



   Standards
Cover Rubber
Adhesion
Tensile Strength TD
Elongation at break
Abrasion
Cover to Ply
Cover to Ply
Ply to Ply
AS 1332
Mpa
%
mm3
N/mm
N/mm

N/mm
(≤1.9mm)
(>1.9mm)
AS 1332-N17
17
400
200
4
4.8
6
AS 1332-M24
24
450
125
4
4.8
6



Standards
Cover Rubber
Adhesion
Tensile Strength TD
Elongation at break
Abrasion
Cover to Ply
Cover to Ply
Ply to Ply
RMA
Mpa
%
mm3
N/mm
N/mm
N/mm
(≤1.6mm)
(>1.6mm)
RMA-I
17
400

3
4.4
4
RMA-II
14
400

3
4.4
4



Standards
Cover Rubber
Adhesion
Tensile Strength TD
Elongation at break
Abrasion
Cover to Ply
Cover to Ply
Ply to Ply
SANS 1173
Mpa
%
mm3
N/mm
N/mm
A
18
400
70
5
7
C
20
400
150
5
7
M
25
450
120
5
7
N
17
400
150
5
7


Company Introduction and workshop






Production Process






Application


The Single / Multi textile conveyor belt is widely applied to conveying materials in the fields of mine,ports.metallurgy,building,chemical engineering,electric power,gain,etc


Supported ports have Qingdao,Shanghai,Ningbo,Tianjin
It can also be based on customer requirements








Product packaging


We offer a variety of packing solutions, it can also be customized according to your requirements.






Shipments




Why Choose Us


Professional, dedicated, attentive
1.Professional services help you to choose a suitable conveyor belt,design your site and max your profit.
2.Rich experience on manufacturing and trading,ensures your trouble-free shopping.


FAQ


1. Are you manufacture or trading company?
We are factory, established in 2003.
2. How long is your delivery time?
7-10 days for the stock, 15-30 days for the mass production.
3. What is your payment method?
30% deposit in T/T advance, 70% balance before shipment.
4. How long is the warranty? Does your company supply the spare parts?
One year. Spare parts for you at lowest cost.




0.1941 s.