Share on (1600457632475):
ABS Plastic Broom Holder and Garden Tool Organizer 4 Position with 5 Hooks Garage Storage
| Product Name | Broom Holder |
| Item No. | RJ-106 |
| Material | ABS |
| Dimension | 37.5*8.3*6.8 CM |
| N.W. | 290 G |
| Package | 1pc into a color box,then 30pcs into a carton |
| N.W./G.W. | 11.85/12.7 KGS |
| Measurment | 45.5*45.5*40 CM |
| Parts | 4PCS Screws,4PCS Anchor |
| Color | White Grey,Customized |
| MOQ | 1000 PCS |
TO INSTALL:
·Place the broom and more holder with hooks upward.
·Place the broom and more holder on a flat wall.
·insert the tip of a pencil into each mounting hole to mark the locations for mounting the hardware.
·select a 1/4”(6mm) drill bit from the drill bit set to match the diameter of the hollow wall anchor .Drill a hole at each mounting location with the 1/4”(6.35mm)drill bit secured in the drill.Drill a 1 1/4”(3cm)deep hole.
·Tap the hollow wall anchorinto each drilled hole with a hammer.
·Align the mounting holes of the broom and more holder.Thread a screw into each hollow wall anchor.
·Tighten each screw with a Phillips-head screwdriver to complete the installation of the broom and more holder.
TO CLEAN:Wipe with a soft damp cloth.
CAUTION:
·For indoor use only.
·Do not place large or heavy objects on the broom and more holder.
·Do not overload the holder with items.
·Do not use for any other purpose other than intended use.
Fit handles with 19mm-31mm





· Establised In 2010
· Cover An Area Of 4000 Square Meters
· 12 Sets Injection Machine
· 1000+ Sets Mould
· 3 Sets Environmental Protection Equipment
· Focus On Plastic Products.
1) Auto Parts ( Wheel Center Cap, Rivet, Body Sticker...)
Supply For Wheel Factories, Refit Shop,On-Line Sellers.
More Than 350 Kinds Of Center Caps
More Than 50 Kinds Of Plastic Rivets
5-20 Days For Producing
2) Household Organizer (Broom Holder, Bathroom Organizer...)
Supply For Trade Company, Off-Line, On-Line Sellers.
5-35 Days For Producing
Customized Color, Packings Are Acceptable.
· Samples And Drawings Are Welcome To Develop New Mould
· Mould Work Day:18-30 Days
·Trade Term:EXW YONGKANG/FOB NINGBO /SHANGHAI
·Payment Term :
1.Trade Assurance
(about 2.8% commision and pay via credit card when the payment less than $1000)
2.T/T
3.PAYPAL (5% commision)
·Delivery Time:
2-3 days if the goods are in stock .
10-20 days ,It's accoding to your qty and requests if the goods are out of stock.
·Customized color or colorbox is available when your qty meet 3000pcs.
Welcome to samples or drawings for opening mould .
New products from manufacturers at wholesale prices