Share on:
QH Bottles Glass Packgaes | ||||||||
Technique Parameters | 1 Anti-thermal shock degree:>=41 degrees | |||||||
2 Internal-stress(Grade): | ||||||||
3 Thermal Tolerance:120 degrees | ||||||||
4 Anti shock:>=0.7 | ||||||||
5 As, Pb content: conforming to food industry restriction | ||||||||
6 Pathogenic Bacterium:Negative | ||||||||
Production Process | ||||||||
Raw materials | Silica sand,Soda ash,limestone,and cullet (crushed glass) others. | |||||||
Batch House | Weighting and mixting of raw material,and transports to the hopper at the melting furnace. | |||||||
Melting | Melting of mixed raw materials about 1600 degrees in the melting furnace. | |||||||
Feeding | Feeding of glass gob at optimum temperature suitable to bottle weight and shape is fed into a glass bottle forming machine via the feeder. | |||||||
Forming | Forming of bottle by the glass bottle-forming machine for designed bottle shape | |||||||
Annealing | Annealing of bottles as they leave the glass bottle-forming machine. | |||||||
Inspection | After annealing in the lehr,a bottle is strictly checked on Automatic inspection machine and visually inspect each bottle to confirm quality by skilled technicians. | |||||||
Additional Processing | A)Hot-end Coating B)Cold-end coating | |||||||
Packing and shipment | Bottles are packed according to their destination and are stored in the warehouse or shipped. |
Product Name | Big Size Oval Glass Jugs Vase for Home Decal Clear Color with Small Mouth |
Capacity | S,M,L |
Material | glass |
Surface Treatment | screen printing, hot stamp, frosting, decal, painting |
Logo Printing | Available |
Lid,cap | Cork/zinc alloy nozzle/aluminum screw cap/glass stopper etc. |
Lead Time | 1.Mold lead time: 7-15 days 2.Samples lead time: 3-10 days 3.Mass production lead time: 25-45 days |
Min.Order Quantity | 2,000 pcs |
Product Capacity | 150,000 pcs/day |
Packing | Safety Packing ,such as inner box bulk packing/color box/white box/display box/standard export pallet at the customer’s request. |
Delivery Time | 35-45 days after receipt of 30% T/T deposit or L/C at sight |
Code | Section Description | Points achieved | Weight | Weighted score | |
Part 1 (C1-C10) | Design Control | 6/10 | 10% | 6% | |
Part 2 (C11-15) | Purchasing Control | 4/5 | 5% | 4% | |
Part 3 (C16-C20) | Storage Management | 5/5 | 5% | 5% | |
Part 4 (C21-C30) | Incoming Inspection | 8/10 | 15% | 12% | |
Part 5 (C31-C50) | Production Control | 18/20 | 25% | 22.5% | |
Part 6 (C51-C60) | Final product inspection & testing | 8/10 | 10% | 8% | |
Part 7 (C61-C65) | Control of measuring & testing equipment | 2/5 | 5% | 2% | |
Part 8 (C66-C70) | Resource management | 5/5 | 5% | 5% | |
Part 9 (C71-C80) | Continuous improvement | 8/10 | 10% | 8% | |
Part 10 (C81-C90) | Social & Environmental responsibility | 9/10 | 10% | 9% | |
Total: | 68/87 | 100% | 81.5% |
Machine Name | Brand & Model No. | Quantity | Number of Year(s) Used | Condition |
Electrical Furnace | No Information | 4 | 5.0 | Acceptable |
Blow Mould Machine | No Information | 1 | 4.0 | Acceptable |
Quenching Machine | No Information | 2 | 4.0 | Acceptable |
Laser Cutting Machine | No Information | 3 | 10.0 | Acceptable |
Fire Polishing Machine | No Information | 3 | 10.0 | Acceptable |
Inspection Line | No Information | 3 | 4.0 | Acceptable |
Machine Name | Tech | Quantity | Number of Year(s) Used | Condition |
Measurement apparatus | Dimension check | 25 | 16 | Acceptable |
Impact force tester | impact force | 4 | 12 | Acceptable |
Stress Instrument | stress | 3 | 3 | Acceptable |
Thickness gauge | bottle wall thickness | 6 | 12 | Acceptable |
Bottle interior pressure tester | Interior pressure | 4 | 3 | Acceptable |