Carbonated Beverage Bottle Filling Machine/Carbonated PET bottle Filer

Share on (1600460650654):


Price:$22,000.00

Quantity:


Product Overview

Description


 Carbonated Beverage Bottle Filling Machine/Carbonated PET bottle Filer


 


   


 


  


 


 


This series of Automatic Carbonated Beverage Filling Machine are applied to used in production of PET bottle-packing carbonated beverage such as aerated water, sprite, coca-cola, gas containing juice , it integrates bottle washing, filling and capping into one body of this machine. It is very convenient to change bottle size by means of advanced bottle conveying technology--bottleneck clamping & bottle suspending technology.


 


  


 photobank (15)_


 



Main Feature



  • This machine has a compact structure, perfect control system, easy to operate and highly automated

  • The parts contact with product is made of quality SUS, anti-corrosive, and easy to clean

  • By adopting high speed filling valve, the liquid level is precise and no waste. That guarantees the demand of filling technology

  • The capping head adopts constant torque magnetic device to guarantee capping quality and impact cap

  • This machine has a high efficient cap arranging system, perfect cap feeding and protection device

  • Equipped with perfect clean management system to ensure the bottle clean

  • Only by changing the star-wheel, can realize to fill the changed bottle shape

  • The machine adopts perfect overload protective device can ensure the operator and machine safe

  • This machine adopts adjustable frequency converter

  • The main electric components, frequency, photoelectric switch, proximity switch, electric control valves all adopt imported components, which can ensure the quality performance

  • The control system has many functions, such as control producing speed, cap shortage detection, bottle block automatic stop and production counting etc

  • The electric components and pneumatic components are all introduced from world famous brand products


 


 


IMG_9442


 


 





Origin of Main Parts


 








































ItemPart NameBrand name
1Frequency convertersMITSUBISHI
2PLCMITSUBISHI
3Touch screenMITSUBISHI
4Electricity panelWell organized
5Photoelectricity Control partsOMRON
6 PumpCHINA

 


 





Main Technical Param


 






























































Model:DGCF16/12/6DGCF18/18/6DGCF24/24/8DGCF32/32/10DGCF40/40/12
Production Capacity:500ml(b/h)2000-30004000-60006000-800010000-1200012000-15000
Filling precision<5mm (liquid level)
Filling pressure(Mpa)0.4
Suitable bottle standard:(mm)Bottle diameter: φ40-φ80, bottle height: 130-280mmBottle diameter: φ50-φ100   bottle height: 150-320mm
Suitable cap standard:(mm)Plastic screw cap, 50-110
Total power(Kw)5.035.036.578.0710.07
Overall Dimension
(L×W×H, mm)
2100×1500
×2200
2450×1800
×2200
2750×2180
×2200
3600×2200
×2600
4300×2300
×2750
Total Weight:(kg)20003500550080009500

 


 





Technology service


 1.Installation and adjustment



  • After the equipments are arrived at the customer’s site, the customers is responsible for unpacking and arranging the equipment according to the placement drawing; and do under our install-adjust technicians’ guidance

  • According to requirement of water, electricity, air and steam consumption and the demands of quality level and pipeline, the User should connect the wire, cable and pipe of water, air and steam to the special position ordered in the installation area of production line ahead of time. Other relevant matching equipment and project should be finished before we adjust our equipment

  • We’ll bring a suit of portable installation and adjustment tools ourselves during the period of installing and adjusting, the other instruments we need should be furnished by the customer for free including oxygen, acetylene angry, argon, etc. needed in the installation and adjustment site

  • The customer should dispatch the capable person to accept training in the installing site


2.Training



  • We are responsible for offering the technical training to user. The training content includes the structure and maintenance of the equipments, control and operation of the equipments. The training lessons are finished in the process of installation and adjustment. Through training, users' technical staff can grasp and the skill of operation and maintenance proficiently, and deal with the general troubles in time


3.Quality assurance



  • We guarantee the goods offered are brand-new, unused, with latest design and suitable material made, and we guarantee the specification of the equipments is consonance with the contract

  • We are responsible for the fault and damage of the production line caused by our design, technology, manufacture, installation, adjustment and material defect etc that all belong to our responsibility


4.Maintenance



  • Offer 12 months maintenance period to the problem that caused by our design, manufacture and the material quality, and offer the relevant parts and effective service for free for above reason. We will offer a widely and favorable technical support, after service all the time after guarantee period


 


3-in-1Washing Parts01




0.1925 s.