sedimentation tank lamella clarifiers tube settler small capacity

Share on (1600464698331):


Price:$9,900.00

Quantity:


Product Overview

Description



Product Description


sedimentation tank lamella clarifiers tube settler small capacity

Application:
1. the industrial sewage
2. the sanitary sewage
3. the coal mine pit sewage
4. the non-ferrous metal processin gwaste water
5. the river water
6. the chemical industry, coal, electric poer, fat, machinery sewage treatment projects.
Advantages:
1),simple structure,without wearing parts,wear well,decrease maintenance
2),steady operation,easy operation
3),small power,save energy
4),small occupy area, low investment, high efficient
5),short retention time, high sediment efficiency, no sludge backflow.



modle
CXGC-5
CXGC-20
CXGC-30
CXGC-60
CXGC-100
CXGC-150
CXGC-200
CXGC-300
capacity (9h/d)
5
20
30
60
100
150
200
250
size (m)
3*1.8*2.5
5*2.8*2.7
6.6*2.8*2.7
14*2.8*2.8
9*3.8*3.5
12*3.8*3.5
17*3.8*3.5
17*4.3*3.5


Details Images






Our Company




Shandong Innovation Huayi Environmental Engineering Co, Ltd. It's a new and high-tech enterprise specialized in environmental protection equipment, which is innovated development, manufacturing , technological design, technical services. We specialized in sewage disposal environmental protection equipment, which contains Dissolved air flotation machine, domestic sewage treatment equipment, industrial waste water treatment, sludge dewatering machine series, waste incinerator, pulp making line and paper machinery and many , etc. The Products was sold well throughout 29 cities, exported to many countries such as Malaysia, Vietnam, Pakistan, Mexico, Indonesia, Venezuela etc.
primary clarifier with lamella tube settler pvc






Certificates




Product packaging




FAQ


Q:How to pay?
A:TT and L/C are acceptable and TT will be more appreciated.
Q:What is the delivery time?
A:It depends on order quantities. Generally speaking, the delivery time will be within 4 to 6 weeks.
Q:How to pack the products?
A:We use standard package. If you have special package requirements, we will pack as required, but the fees will be paid by
customers.
Q:How to install after the equipments arriving destination?
A:We will provide detailed illustrations to you. If it is necessary, we will send technicians to help you. However, the visa fee,
air tickets, accommodation will be paid by buyers.


0.2001 s.