A554 Stainless Steel Tubes 201 Rectangular Pipe BA SS Rectangular Pipes Polished Stainless Steel Tube

Share on (1600464973535):


Price:$1,500.00

Quantity:


Product Overview

Description



Product Description


Product Name
Stainless Steel Satin Rectangular Welded Pipe
Model Number
VM 1001
Material
201/ 304 /304L/316L/409/430
Certificate
ISO / AEO/ MTC
MOQ
1 Ton
Size
10x20-150x200
Surface
Mirror Finish
Thickness
0.6mm-5.0mm
Delivery Time
30 days for a container quantity
Payment Terms
T/T, LC, Cash, etc. Normally 30% by T/T in advance, balance to be paid before shipment.
Packing
Each tube will be packed in plastic bag, then several tubes will be packed by hollow plate or weaving bags.


Product & Application




Size List




Product to Compare






3D Show Room


VR


Company Profile






Production Processes




Packing & Delivery




Contact Us





FAQ


1. What is your location?
We are located in Sanshui District, Foshan City which is a famous stainless steel production base.

2.What's the annual output?
Vinmay produce more than 25000 tons stainless steel tubes in a year.

3. What is your welding method?
All of our tubes are welded by tig welding methods. Our tubes can get fully welding and smoonth inner welding, without blisters,
leak welding or black line. All of our tube are good for tube bending.

4. How do you control the quality during the polishing process?
1)As for the mirror polish square/rectangular tube , we will polish it as least four times)
2)During the polishing processing, we set a special sanding wheel to polish the welding part.
3)To avoid scratches,after polishing,the tubes will be lay out on a steel crate then we could lift the whole steel crate instead
of the tube.
4)On the other hand, we use the gunny bags to protect the tube's surface when the tube laying-out.

5. How do you inspect the tubes?
The Quality inspectors inspect the tubes during each production processes from raw material,tube welding,polishing,packaging.
1) Before the production of each machine, we will have the first checked and record the data.
2). During the production, our inspector and engineer have been carefully moniting and we record the data every two hours.


0.2637 s.