Beston 1200 1500pcs/h paper pulp egg carton tray making machine price automatic with drying system

Share on (1600467801073):


Price:$11,000.00

Quantity:


Product Overview

Description





Model
Production/H
Total Power
Overall dimension
Drying method
BTF1-3
1000pcs
33kw
2.3*1.7*1.6m
Natural drying
BTF1-4
1500pcs
49kw
2.3*1.7*1.6m
Natural drying
BTF3-4
1800-3000pcs
40kw
3.1*3.7*3m
Brick drying/Metal drying
BTF4-4
2200-2500pcs
65kw
3.1*3.7*3m
Brick drying/Metal drying
BTF4-8
4500-6500pcs
85kw
3.3*2.6*2.7m
Brick drying/Metal drying
BTF5-8
5000-7000pcs
110kw
3.3*2.6*2.7m
Brick drying/Metal drying



Pulp system
*The waste papers will be put into the hydraulic pulper turn to rough pulp.
*Then the rough pulp will flow into homogenization pool.
*After adjusting the concentration pulp to supply plup to forming system.



Forming system

*Fully automatic molding system, molds can be customized.
*Easy to install,fast forming.
*Low product damage rate.


Metal drying system

*Multi-layer drying system, the internal temperature can reach 120 degrees.
*Fast drying paper tray, fast delivery.
*High temperature resistant material, long service life


BTF1-3 1000pcs/h machine
BTF1-4 1500pcs/h machine
BTF3-4 2000pcs/h machine


BTF4-4 3000pcs/h machine
BTF5-8 5000pcs/h machine
BTF6-8 6000pcs/h machine








Beston (Henan) Machinery Co., Ltd. is an innovative high-tech enterprise. We have been engaging in technology research, manufacturing and service import and export for many years.
Beston manufacturing base was built in 1998, which is committed to environmental protection industries. With over 20 years’ unremitting effort and development, we have been the industry leader.The main products are biomass waste recycling production lines, including garbage sorting production line, waste tire and plastic pyrolysis production line, rubber powder production line, waste oil rectification production line, waste biomass carbonization production line and waste paper pulp production line. Our equipment has been exported to dozens of countries and regions like Europe, Middle East, Southeast Asia, Afria, South America, etc., being highly appreciated by foreign Governments and customers.









1.Independent and complete after-sales service system, escort from installation to production.
2.Professional engineers, technicians, 24 hours online guidance, efficient and fast.
3.Customer first, passion and dedication, honesty and responsibility.




1
.On-site installation, professional guidance.
2.Fluent in spoken English and convenient communication.
3.Professional engineer service, put into production quickly.




1.24H Online guide installation
2.Online guidance by a team of professional engineers saves costs.
3.Many successful cases, faster and more efficient.


customer feedback
.


Beston Global Project Cases









FAQ
Q1. Why we choose our company?
A1. We have 10 years’ rich experience in paper puling molding industry. We have professional technical team and advanced technology. We are factory direct sale, we can provide you best quality and service at a reasonable price.

Q2. Where is our company located? How can I visit there?
A2. Our company is located in Zhengzhou city, Henan province, you can fly to Zhengzhou airport. When you confirm your flight No. and date, please tell us then we can arrange to pick up you.

Q3. How many countries haveour machine been installed?
A3. Our equipment has been already exported to more than 20 countries, such as Algeria, Egypt, Russia, Ukraine, Australia,
Argentina, Brazil, Saudi Arabia, Libya, Syria and other countries.

Q4. What products can this machine produce, or do we provide customize service?
A4. This machine can produce egg trays, egg box, egg carton, fruit tray, wine tray and so on. If you want to other different paper industrial packages, we also can provide customize service per your requirement after you provide samples, like pictures or dimensions etc.

Q5. What should I do if I don't know how to install the machine after I bought it ? Can you install the machine in my country? What's about the after-sales service?
A5. After our customers placed orders, we’ll arrange professional engineers to go to customer’s country, they’ll help to install and train workers for operation and maintenance. In addition, we have abroad visiting for once or twice every year for checking customer’s equipment.

Q6. What's the payment term?
A6. 30%TT prepayment before production, the balance payment need to be paid before shipment.


0.206 s.