Smart Design changing room plain 5 compartment hpl locker

Share on:


Price:$40.00 - $60.00
Price in USD:Details

Quantity:


Product Overview

Description





Product Description








Compact laminate board
Density :1450kg/m3
Thickness:4mm ,5mm, 8mm ,12mm
Second generation board
Density :1200kg/m3,1400kg/m3
Thickness:4mm ,5mm, 8mm ,12mm


Name
HPL locker
Material
Phenolic compact laminate Or Second generation board
Color
Solid color, wood grain, marble, flower, metal
Thickness
4mm, 6mm, 8mm, 12mm...
Lock
Digital lock, Key lock, RFID lock
Size
Standard size for per column (mm): 300W*400D*1800H
Others sizes could be customized
Advantages
1.easy to install,clean and maintain
2.security, health
3.waterproof and fireproof
4.rust resistant, moth resistant,totally environmental protection
5.a wide range of colors for your choice
6.could be customized according to your request
7.extremely durable
8.shock resistant, impact resistant,scratch resistant
9.free from peculiar smell
10.top quality in terms of material and processing
Application
High-end fitness clubs, Gym,SPA houses, swimming pools, theme parks, spot centers, store counters, schools, hospitals, houses,
supermarket, hotel




Product Feature








Product Display




Application: For family、supermarket、hospital、hotel、office


Production Process




We provide you with installation process demonstration
1.Install left &right board and back board;
Connect left &right board and back board with M4*12Round head screw,Stainless corner fastener.
Accessory and tools needed:M4*12Round head screw,Stainless corner fastener and electronic hand drill.

2.Install two pcs of partition1 and top& bottom board.
Firstly,connect partition 1 and back board with M4*25 wafer head self tapping screw, then separately connect the left &right board with M4*12Round head screw,Stainless corner fastener。Same ways to install the top& bottom board.
Accessory and tools needed:M4*12Round head screw, M4*25 wafer head self tapping screw, Stainless corner fastener and electronic hand drill.

3.Install the cork base bottom board.
Connect the cork base and left&right side board,bottom board with M4*12Round head screw,Stainless corner fastener. Accessory and tools needed:M4*12 Round head screw, Stainless corner fastener and electronic hand drill.

4.Install clothes rail and flange
Put the clothes rail through the holes of the partition2, and cooperate with each other to determine the position of the flange.Then Install clothes rail and flange.(Mention: while installing the door board,need to move partition2 to make it easy. Accessory and tools needed:clothes rail and flange, M4*12 Round head screw,electronic hand drill.

5.Install the door board with hinge(pay attention to adjust the crack between the door and side board.)
Accessory and tools needed: Hinge, M4*12 Round head screw,electronic hand drill.

6.Install partition2
Connect partition2(top&bottom and back part) and partition 1,back board with M4*25 wafer head self tapping screw.
Accessory and tools needed:M4*25 wafer head self tapping screw,electronic hand drill.

7.Install the door lock.
Accessory and tools needed:door lock, M4*12 Round head screw,electronic hand drill.


Company Profile


Our factory has introduced Europe advanced production technology and superior production lines. After more than 20 years practice and improvement, we are professional in producting flooring and HPL, and have mature production technology.We have good aftersales service.






FAQ




1.Q: Are you trading company or manufacturer ?
A: We are factory.
2.Q: How long is your delivery time?
 A: Generally it is 5-10 days if the goods are in stock. or it is 20-25 days if the goods are not in stock, it is according to quantity. 
3.Q: Do you provide samples ? is it free or extra ? 
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.
4.Q:What is your terms of payment? 
A: 1.T/T 30% as deposit, and 70% pay against the copy of B/L. 2.L/C at sight. 3.D/P at sight.
5.Q. What is your terms of delivery? 
A: EXW, FOB, CFR, CIF.




0.0094 s.