Manufacturer Competitive Price Clean Room 2*2 Fan Filter Unit

Share on (1600499683460):


Price:$135.00 - $155.00

Quantity:


Product Overview

Description



Product Description


 


 


 Hepa fan filter unit cleanroom filter systems FFU 


3.png


 


EC FFU Features:
EC brushless motors for quiet, energy-efficient operation, three speeds control, and longer service life
High Efficiency Particulate Air (HEPA) Filter H14: 99.99% efficient at 0.3µm particle diameter
Filters are leak tested in accordance with IEST and meet American market for safe, reliable service
Approx. Max Flow = 900 CFM (350 Watts)
Internal baffling plate and diffuser panel provide quiet uniform air flow across the filter face


 


FFU units for the equipment of individual work areas or entire cleanrooms.


Due to the symmetric construction of the noise absorbing internal flow fixtures,
the ffu filter downstream air velocity becomes very consistent and the sound power level is very low.
The FFU S is in particular suitable for applications in unidirectional (laminar) airflow cleanroom areas
with advanced requirements regarding downstream air velocity uniformity and noise level.


Depending on the configuration of the filter coverage and of filter classes,
cleanroom ISO 4 to ISO 8 according DIN EN ISO 14644-1 can be reached.


 


Performance Parameters



























































TYPEVALUETYPEVALUE
Housing Size4*2' or customizedHEPA Size1200*600*69mm
Voltage120/230/50/60HZHEPA efficiencyH14,@99.98
Air velocity0.35-0.45m/sAir volume1000m'3/h
MotorPlastic impeller or aluminum impellerNoise55pa
Phase1Currency1A
Weight40kg without hepaOperating temperaturemin.: 0 °C | max.: 40 °C
Clean room sound pressure level100 % occupancy: 58 dB (A)External pressure differencemax.: 330 Pa
Power consumption170waHEPA replacement1 year

 


Constructive Design:



The fan filter includes essentially of the housing, the HEPA filter  and the compact fan unit with impeller
and motor . The integrated baffle plate optimizes the uniformity of airflow towards the filter.
The sound absorber reduces the fan noise level. The following additional accessories are available:


Prefilter for coarse particle filtration
AMC-filter for filtration of gaseous containments
Cooling coil/heating coil
Aerosol inlet connector, Aerosol measurement connector
air diffuser (perforated plate diffuser, swirl outlet)


The FFUs generate an uni-directional air-flow. If necessary filter cell classes H13 to U17 can be used.
With implementation of the air diffuser a turbulent airflow inside the cleanroom is created.
The FFU fans have sufficient reserve capacity to overcome any additional pressure loss due to e.g. raised floor, return air ducts, prefilter or cooling/heating coils.
The FFU AC is driven by a special developed single phase external rotor AC motor with internally wired thermal contacts for overload protection.
The FFU EC is driven by an eletronically commutated external rotor motor.


 


Products  show:


NeoImage_.jpg



_20210630154341.png_20210630153851.jpg


 





Company Information


 Guangdong Yaguan (cleanroom) Construction Co., Ltd  was established in 2011, we specialize in doing cleanroom project.
We have a vibrant and comprehensive team of technology, the existing staff of 120 people and six senior engineers, three professional and technical qualifications engineers, the company has a strong construction strength and strong technical force, health care, business plants, medicine, food industry, the hospital industry, and made excellent achievements. No matter what we got any luminous achievement before, we will continue to supply our best service and quality for any request from you with our professional team in the future


1.png


 


 


 14.png


 


4.png


 





Our Services

5.png6.png7.png

 Clean room hardware manufacturer ,design&construction:_20210624101621.png


 


_20210624101627.png


 


 





Inquiry Contact Info


 .jpg


 


 





FAQ


Q1. Can you produce acording to Customers'design?
Yes, both the products and the packaging can be in customized.
Q2. What is your terms of payment?
A: We accept the western union/Money Gram/ T/T;
Q3. How long is the leading time?
A: Generally, 20ft container take 7 to 15 working days on payment. A 40ft container takes 15-25working days.
Q4. Do you accept sample order before bulk order?
A: Yes, we can produce by your samples as your design drawings.And we have our tech dpt. Can help your product developing.New Moulding takes about 7-15working days.
Q5. Do you test all your goods before loading?
A: Yes, we have 100% rigorous test before delivery.
Q6.What is the after-service policy?
Within the service life of the products, our company is there responsible for the using and maintain instruction.
Q7, Do you have designers and engineers?
We have 4 designers and 8 engineers, and we can give you free CAD drawing and 3D drawing after placing order.




0.2004 s.