Share on (1600511130715):

Application | Aluminum construction (window and door / wall curtain) |
Material | Alloy 6061 / 6063, We will never use aluminum scrap |
Temper | T3-T8 |
Surface Treatment | Mill-Finished, Anodizing, Powder Coating, PVDF, Electrophoresis, Wood Grain, Polishing, Brushing, etc |
Alloy or Not | Is Alloy |
Machine | High Precision CNC Machining |
Colour | Silver, champagne, Bronze, Golden, Black, White, Gray, Sand coating, Anodized Acid, Alkali, and wood texture, or Customized |
Film Standard | Anodized:7-23 μ , Powder coating: 60-80 μ , Electrophoresis film: 12-25 μ |
Lifetime | Anodized for 12-15 years outdoor Powder coating for 18-20 years outdoor |
MOQ | 400 kgs per design. Usually 10-12 tons for a 20'FT; 20-23 tons for a 40HQ |
Length | 3.0-7.2 Meters or Customized |
Thickness | 0.4mm-20mm or Customized |
Application | Buildings, Constructions and Decorations |
Extrusion Machine | 3000 tons all together 3 extrusion lines |
Capability | Output 3000 tons per month |
Profile type | 1. Sliding window and door profiles 2. Casement window and door profiles 3. Louver window and door profiles 4. Bi-fold window and door profiles 5. Pivot window and door profiles 6. Awning window profiles 7. Heating insulation / thermal break profiles 8. Wall curtain profiles |
Shape | Various shapes, parameters and colors available |
New Moulds | Opening new mould about 7-10 days, absolutely moulds cost can be refund after mass production order |
Free Samples | About 3 workdays can be sent |
Fabrication | Die designing→ Die making→ Smelting & alloying→ QC→ Extruding→ Cutting→ Heat Treatment→ QC→ Surface treatment→ QC→ Welding→ Packing→ QC→ Shipping→ After Sale Service |
Deep Processing | CNC / Precise cutting / Punching / Checking / Tapping / Drilling / Milling / Fabricating |
Certification | 1. ISO9001-2008/ISO 9001:2008 2. GB/T24001-2004/ISO 14001:2004/ GB/T28001-2001 3. GMC / TUV / SGS |
Quality standard | Quality complies with international standard |
Design | OEM or ODM is available, please send us your drawing |
Feature | High corrosion-resistance, Weather-resistance, Heat-resistance, Alkali-resistance, Anti-scratch, Anti-deformation |
Packaging Details | PE film for each profile/ Shrink PE film for each bundle, Slot packing, Craft paper/ Foam Paper/Carton box |
Lead time | 1. 15 days production; 2. If opening new mould, 20 days. |
Payment | 1. T/T: 30% as deposit before production, 70% balance will be paid before Loading; 2. L/C: the balance irrevocable L/C at sight. |







New products from manufacturers at wholesale prices