ABS pet pp sheet extrusion line production line plastic sheet making machine line

Share on (1600512302289):


Price:

Quantity:


Product Overview

Description





VR


Our strengths






Products Description
















Product Paramenters


Raw Material
PP GPPS HIPS PE Calcium Carbonate+PP
Production Capacity
180~220kg/h
(Depends on sheet thickness)
The machine can be customized according to customer demands.
Sheet Width
≤1000mm (PP); ≤970mm (PS)
(Depends on sheet thickness)
Sheet Thickness
0.2~2.5 mm
(Depends on material)
Layer
1
Water Consumption
2.5~5.0 m3 /hr (recycled)
Screw Diameter
110mm
Screw L/D Rate
33:1
T-Die Width
1100mm
Millor Roller Length
Φ350mm × 1200mm
Electrical Consumption
60kw/hr
Mian Motor Power
55kw
Total Power
110kw
Weight
6.8T
Machine Dimension
13.2m*1.3m*2.2m (L*W*H)
Power Supply
380V 50HZ ; 3phase 4 wire
Waste Unwinder: 1 set
Single Position Rewinder: 1 set
Thermostat: 1 set (For making PS sheet)
Electric Cabinet: 1 set


Company Profile








Logistics transportation




FAQ


1. Q: Are you a factory or trading company?
A: We are a factory.

2. Q: How does your factory do regarding quality control?
A: We have passed the ISO9001:2000 Quality Management System and CE certifate and we have a special QC department in charge of
products' quality.

3. Q: How long is the warranty period?
A: Cam System three years, others machinery have one year warranty,

4. Q: What's the main market of your company?
A: Our products are well sold throughout the country and exported to many different countries, such as, Southeast Asia, Russia,
Europe, Middle East, Africa, America and etc.

5. Q: How much production capacity of your company one year?
A: This depends on your needs.

6. Q: Can we visit your machine operation in your factory?
A: We have own plastic products company, you can see all the machine operation.

7. Q: Where is your factory located?
A: Our factory is located in Xingbei Road, Doubei Village, Haixi Town, Pingyang County, Wenzhou City, Zhejiang Province, China.

8. Q: How to reach our factory?
A: It will take 50 minutes from Wenzhou Airport by car, 25 minutes from Ruian Highspeed Rail Station by car.


contact us




0.0177 s.