city sewage treatment biogas plant for domestic sewage waste recycling

Share on (1600516953792):


Price:$8,900.00

Quantity:


Product Overview

Description



Product Description


laundry waster water recycling system


Application:

Residential area

Building water reusage

Hospital sewage processing

Carwashing sewage processing

Hotel sewage processing

High density organic sewage processing



Features

1. Made of Carbon steel. Stainless steel. FRP.

2. High-performance anti-corrosion paint

3. Can be buried entirely or half in the ground or totally on the ground.

4. Low energy consumption, low noise, low operation cost.

5. Easy maintenance, easy to manage

6. With MBR technical, get small size, better water.




Model
Administrator(㎥/h)
size(L*w*h)
CXMBR10
10
1.8*1.5*1.8
CXMBR20
20
3.5*1.5*1.8
CXMBR30
30
5*1.5*1.8
CXMBR50
50
4.5*1.5*2.4
CXMBR100
100
8*1.5*2.4
CXMBR200
200
8*3*2.4
CXMBR300
300
8.5*3*3


Detailed Images




installation
Installed underground
installation
installed above ground


mbr membrane
hollow fiber membrane
treatment effect
treatment effect


Packing&Shipment






Our Company


Shandong Innovation Huayi Environmental Engineering Co, Ltd. It's a new and high-tech enterprise
specialized in environmental protection equipment, which is innovated development, manufacturing , technological design,technical services.
We specialized in sewage disposal environmental protection equipment,which contains Dissolved air flotation machine, domestic sewage treatment equipment, industrial waste water treatment, sludge dewatering machine series, waste incinerator, pulp making line and paper machinery,and many , etc. The Products was sold well throughout 29 cities, exported to many countriessuch as Malaysia, Vietnam, Pakistan, Mexico, Indonesia, Venezuela etc.









certificates


Our most professional packaging

Transport of large trucks to the seaport

And international transport cooperation



FAQ


Q:How to pay?
A:TT and L/C are acceptable and TT will be more appreciated.
Q:What is the delivery time?
A:It depends on order quantities. Generally speaking, the delivery time will be within 4 to 6 weeks.
Q:How to pack the products?
A:We use standard package. If you have special package requirements, we will pack as required, but the fees will be paid by
customers.
Q:How to install after the equipments arriving destination?
A:We will provide detailed illustrations to you. If it is necessary, we will send technicians to help you. However, the visa fee,
air tickets, accommodation will be paid by buyers.




0.2072 s.