Share on (1600521013142):

| Information |
| Material | SS,CR,HR,GI,AL,Copper etc. | Slit width | 5 pcs @2.0mm |
| Thickness | 0.2-2.0mm | Side strip width | 22mm |
| Coil width | 500-1350mm | Width accuracy | ≤±0.05 |
| Coil max weight | 8T | Slit straightness | ≤1mm / 2000mm |
| Coil ID | Φ460~520mm | Side edge burr | ≤3% of coil thickness |
| Coil OD | ≤Φ1800 | Line speed | 0~60m/min |
| Display |


| Item | Quantity | Item | Quantity | ||
(1)Backup saddle | 02 pcs | √ | (9) Pinch/shear | 1 set | √ |
| (2)Hydraulic loading coil car | 1 set | √ | (10) Rear loop pit & bridge | 1 set | √ |
| (3) Hydraulic decoiler | 1 set | √ | (11) Tension station | 1 set | √ |
(4)Supporting arm | 1 set | √ | (12) Hydraulic recolier | 1 set | √ |
| (5)Pinch / Leverler / Shear | 1 set | √ | (13) Hydraulic unloading coil car | 1 set | √ |
| (6) Front loop pit & bridge | 1 set | √ | (14) Waste scrap rewinder (on line/off line) | 1 set | √ |
| (7) Side guider | 1 set | √ | (15) Pneumatic & lubrication & hydraulic system | 1 set | √ |
| (8) Slitter head | 1 set | √ | (16) Electric control system | 1 set | √ |
More Products
| Model | Coil width (mm) | Coil max weight (T) | Power (kw) | Speed (m/min) | Thickness (mm) | Floor space (m) |
| 2.0*650 | 150-650 | 6 | 96 | 180 | 0.2-2.0 | 11*4 |
| 2.0*850 | 200-850 | 10 | 96 | 180 | 0.2-2.0 | 11*4 |
| 2.0*1000 | 300-1000 | 15 | 120 | 180 | 0.2-2.0 | 11*5 |
| 2.0*1250 | 500-1250 | 15 | 160 | 180 | 0.15-2.0 | 12*6 |
| 2.0*1600 | 500-1600 | 20 | 240 | 220 | 0.2-2.0 | 22*7 |
| 3.0*650 | 200-650 | 15 | 180 | 150 | 0.2-2.0 | 22*7 |
| 3.0*1250 | 500-1250 | 15 | 205 | 180 | 0.3-2.75 | 22*6.5 |
| 3.0*1600 | 600-1600 | 20 | 230 | 120 | 0.4-3.0 | 23*8.5 |
| 4.0*1600 | 800-1600 | 25 | 220 | 120 | 0.5-4.0 | 25*7.5 |
| 6.0*800 | 200-800 | 15 | 220 | 60 | 1.0-6.0 | 15*5.5 |
| 6.0*1600 | 800-1600 | 25 | 220 | 50 | 1.0-6.0 | 28*10.5 |
| 9.0*1600 | 800-1600 | 25 | 265 | 40 | 2.0-9.0 | 28*10 |
| 12*2000 | 1000-2000 | 35 | 285 | 20 | 3.0-12.0 | 36*10 |
| 16*2200 | 1000-2200 | 35 | 285 | 20 | 4.0-16.0 | 36*10 |
Our Company |

Our Advantages |


| Packaging |



| Contact Us |
| Tel | +86-757-8108 1122 |
| Mobile | +86-13929919722 |
| Fax | +86-757-8108 1116 |
| honjiamachine@gmail.com | |
| web | www.honjia-machine.com |
| Address | #1, Hongying Industrial Zone, Tangtou, Shishan Town, Foshan, Guangdong, China (Mainland) |
| FAQ |
Q1:How much is your machine? A1:Sorry, we cannot answer this question before understanding your exact demand and re- quirements. For example, if you ask: “how much is an APPLE iPhone?” It’s impossible for any salesman to answer. Basically we have to tell them exact model 3/4/5/6/7/8/X or plus, 32/64/128/256G, etc.
Q2:How can I know the design and proposal of the machine line? A2:Generally speaking, we need to know: (1)Machine type: slitting line or cut to length line (normal CTL or flying CTL) . (2)Raw material info: such as thickness/width/master coil weight/coil ID/coil OD. (3)Final product info: such as slit nos (at thinnest and thickest)/min. strip width/precision and tolerance/exit coil ID, etc. such as target length to cut, length tolerance, diagonal tolerance, etc. 4)Line speed: normal type or high speed type 5)Line type: normal type or compact design (for example, same function with single loop or double loops) 6)Electrical system: China mainland/Taiwan/Japan/European brands 7)Optional functions: such as paper collector/film coating/burr masher/digital display/special loading and unloading designs, etc.
Q3:How long will you send the proposal and offer? A3:We will need about 3~7 days to design the proposal upon collecting all details of the ab- ove mentioned info necessary.
Q4:When will you tell me the price? A4:After confirming all detailed configurations of the machine line, that we are able to make offer for it.
Q5:How long do you need to produce the machine? A5:We need about 3 months to produce light gauges; about 4~5 months to produce the me- dium gauges; 6~10 months to produce heavy gauges.
Q6:What pricing terms to you accept? A6:We accept 30% TT as deposit and 70% TT before delivery. 30% TT as deposit and 70% LC terms is also considerable.
Q7:How long do you need to install and commissioning the machine line? A7:Light gauges, we need about 10~14 days; Medium gauges, we need about 28 days; He- avy gauges, we need about 1~2 months.
Q8:How many people will come to install and commission the machine line? A8:Light gauges, we will send 1 engineer, with the assistance of your stuff in your workshop. Medium/heavy gauges, we will send 2~3 engineers, with the assistance of your stuff in your workshop.
Q9:Do I need to pay extra charge for installation and commissioning? A9:We are not charging extra fee for it, but the buyer is responsible for the round trip tickets/ visa/local transportation/hotels of our technicians as well as USD50/day/person allowance only.
Q10:What about the warranty of your machine? A10:We offer 1 year warranty for our machine lines starting from the acceptance date of ins- tallation and commissioning.
Q11:How long do you need to prepare the foundation drawings for the machine line? A11:Upon receipt of 30% deposit, we need about 30~45 days to prepare the foundation drawings for you. |
New products from manufacturers at wholesale prices