TEHONG Source Factory Plastic Elastic Straps Adjustable Heavy Duty 3 Corner Holder Fasteners Mattress Cover Bed Sheet Clips

Share on (1600524363623):


Price:

Quantity:


Product Overview

Description



Factory Display


(Source Factory) Shenzhen Tehong Textile Technology Co.,Ltd.

We
Support
OEM & ODM
Ready to Ship

Factory
Trading Company

Wholesaler
Retailer
Welcome to visit our factory on the spot !
























Sample Room




Customer Photos






Certifications




ISO Certified
Shenzhen Tehong Textile Technology Co.,Ltd.
Design Patent
Shenzhen Tehong Textile Technology Co.,Ltd.
Raw Material Test Report
Shenzhen Tehong Textile Technology Co.,Ltd.


FAQ


Q1: Are you a factory or trading company?
A1: We are a production-oriented factory with complete equipment and production lines and 56 workers.

Q2: What is your hot items?
A2: We have our own R&D team, which can design and prepare samples according to customers' requirements. 80-100 new SKU every year electronics, aquatic products and daily necessities. The products are mainly used in sporting goods, clothing.

Q3: How about the Shipping Method?
A3: DHL/UPS/TNT/Fedex and other air shipments and sea shipments are all workable. In one words, we could do any shipments you wanted.

Q4: How about the delivery date?
A4: Generally speaking, the delivery date of normal purchase quantity is 10-15 working days. However, if the order is large, please communicate with us further. Some products are delivered from stock.

Q5: How about the label and the logo?
A5: Customize label and logo is workable.

Q6: How about the MOQ ?
A6: The minimum order quantity of different products is different. The minimum order quantity is 2pcs and the maximum order quantity is 3000 yards.

Q7: How many the warranty?
A7: Our products are mainly accessories and accessories, which cannot be exposed to the sun for a long time, and the shelf life ranges from 0.5 to 1 year.

Q8: What are the quality requirements?
A8: High quality: use high-quality materials, strictly follow the ISO quality control system, and assign special personnel to be responsible for each production link from raw material procurement to assembly.

Q9: What is the sampling cycle?
A9: According to the samples provided by customers, the sample preparation time is 5-7 working days, and the sample time for R&D and design is 15-20 days.


0.1601 s.