JOYKIE vintage style black 48v 500w 26 inch fat tire city ebike electric motor bike

Share on (1600524414671):


Price:$320.00 - $380.00

Quantity:


Product Overview

Description





If you are interested in becoming our distributor, our plan is as follows.


1. We have warehouses in EU, USA, UK,South America, etc. The overseas warehouse can ship directly to your specified address in the first time.


2. JOYKIE will launch NEW BIKES, EBIKES every year, and we will give priority to the agent with the best price.


Please feel free to contact us.






Product Details






Products Specifications


EHI005 Electric Motor Bike
Specifications
Size
20"/26", following spec applies to 20" size
E-bike System
Motor:
36V 250W Rear Drive Motor
Battery:
36V 7AH Lithium Battery
Display
LED Display
Controller:
3 Modes, Sine Wave, Twist Throttle
Charger:
36V 2A DC2.1
Frameset
Frame:
Hi-tensile Steel Frame
Fork:
25.4*22.2*165MM
Wheels
Rim:
13G*36H
Tire:
20*3.0''
Drivetrain
Gear:
Single Speed
Crankset:
1/2*1/8*40T;*140L
Freewheel:
1/2*1/8*16T
Chain:
1/2*1/8*112L
Pedals:
9/16" CPSC Eco-friendly
Components
Saddle:
Comfortable Saddle
Seat post:
28.6*220L*1.4T
Handlebar:
22.2*560W*120H*1.6
Stem:
25.4*150L*2.2T
Headset:
25.4*34*30MM, 8PCS
Brake set:
Mechanical Disc Brake
Accessories
Extras:
Fender, Kickstand
Package:
85% assembly




Company Profile


VR










Exhibition




Why Choose Us






FAQ




Q: Are you a trading company or manufacturer?
A: We are an experienced manufacturer with a factory covering an area of 52,000 square meters.

Q: Can I have my own customized product?
A: Yes.OEM&ODM are available,including design, logo,package etc.

Q: What's the MOQ?
A: For inventory,the MOQ is 5pcs. For OEM&ODM, the MOQ is 150pcs.

Q: Can I get sample?
A: Yes. We can supply sample for quality test. You only need to pay for the sample and courier. We will arrange it in 3 working days.

Q:What is the payment terms?
A: T/T, Western Union, Paypal ect.

Q: What's the delivery time?
A: Within 15 days for ready stock order.
About 25-30 days for OEM&ODM order.The exact time depends on actual situation.


0.1925 s.