gypsum powder production line with advanced technology

Share on (1600524774705):


Price:

Quantity:


Product Overview

Description



Why Choose Us


NO. 1 in gypsum board configuration and automatic degree in China
We are building material group company with 8 branches specialized in different building material and machinery manufacturing with
30 years history. our company occupy the finest mgo board production ,formular and the highest configuration machinery equipment
in china .


Our service


Cooperate with us you will get:

1-We offer technical support until the workers know how to operate.

2-We offer the technology data and relative files of gypsum board production line. The operating Instruction will go to the customers with the equipment.

3-We provide free answers for all kinds of questions about the gypsum board production line.

4-We provide lifelong guidance of above equipment. Visiting clients in regular times.

5-Excellent easy-broken parts support for buyers. Easy-broken parts guarantee for one year.

6-We can help the customer to do the consignment and the relevant procedure for import and export


Product Parameters




1.Product quality
Reach or exceed the china (GB9776-88《building gypsum》) requirements.
2.Fineness
100 mesh-120mesh
3.Bending strength
Bending strength 1.8 Mpa; Compressive strength: was 3.0 Mpa.(The bending strength have direct relations with raw material)
4.Main relative composition
1)Soluble anhydrous gypsum content:≥ 80% adjustable
2)The content of dihydrate gypsum: ﹤ 5% adjustable
3)Initial setting time: 3 ~ 8 min adjustable; Final setting time: 6 ~ 15 min adjustable.




Machinery Advantage
1
Continuous production: using hammer dryer and soft start.
2
Quality stability: modification mill can increase the specific surface are of materials.
3
Energy conservation and stability: great brand frequency transformer
4
High performance of equipment: using bag dust collector ,water bath desulfurization and denitration treatment, requency transformer,Siemens electrical, PLC, guomao reducer, national standard cable, electrical control: ABB.
5
Easy control: Adpot computer display, PLC control.
6
Mature experience: The core features of our company are mature technologies that can provide a solid foundation for your company.


Product Details




Hammer dryer
1. Before entering into the boiling furnace ,to crush the gypsum enclosed after grading.
2. Moisture is less than 5% , avoid the wet adhesion to plug the pipe, cyclone separation.
3. This process is closed in the air dryer, no secondary dust pollution in the workshop, no need to add dust removal equipment.
4. Crushing effect is more better
5. Good continuity
6. Using the tail smoke to dry the air, reduce the production
7. Cost and solve the environmental protection problem
Modification grinding(ball mill )
1.Through the modification grinding, make the chemical gypsum's quality similar to the natural gypsum powder.

2.Also there is a cooler beside the ball mill , reuse the waste heat, reduce the temperature of the gypsum powder, in this way can
avoid temperature uncontrollable in the ball mill.




FD - chamber boiling furnace technology(hot air )
The FD - chamber boiling furnace technology has been patented by the nation.
1.Reduce investment
2.Power saving
3.Maintenance cost saving
4.Comprehensive utilization rate
5.Quality adjustable
6.The installation period is short and the area is small
7.Environmentally friendly
Finished products packaging and storing system
Having many characteristics, such as waterproof, moisture proof, easy to use, etc.;Size can be produced according to customers’ requirements.
Its upper has dust removal equipment, preventing dust leakage; arch breaker is equipped underneath to prevent powder agglomeration, making the powder discharge smoothly, and is equipped with material level sensor equipment, may control warehouse material usage at any time .


Process Flow




Project Case




12 Years experience in oversea market projects service
No projects of failure.
1) Experience in gypsum technology research since 1998
2) Experience of 100+ projects manufacture &install abroad and domestic
3)Products available in 20+countries


Hot Products




Why Choose Us


What we provide is not ONLY the machine BUT the whole system.
Yurui (Shandong) Machinery Co., Ltd, is an enterprise integrating gypsum projects R&D, design, Manufacturing, exportation, installation, and commissioning.

We have been deeply engaged in the field since 1998, setting up 100+gypsum projects domestic and abroad. Our engineers group who only serve for YURUI left a full footprint over Africa, Asia, and south America, total of 20+countries. We hold different projects
in each area, offering case visiting on-site. Besides we developed online visiting which breaks the limit of the virus.

We are not a machinery provider, but an overall solution provider.
We focus on the demands of users, never stop updating, improving, and surpassing.
We pursue extreme cost performance, not only price.


Our factory
1) Experienced installation group gets projects into production quickly.
How do we ensure the fact installation? Besides the “people”, we provide the installation documents which accompany our machinery.In addition, we extra provide all the relevant documents to enhance your production.

2) the Whole group provide a powerful One-stop sourcing service
We assist our customers in the procurement of all relevant spare parts, saving them time to the greatest extent and preventing downtime due to spare parts. At the same time, we ensure the maximum adaptability of the parts purchased later to the original equipment.


Packing






Service


1) Pre-sales: Full cooperation with pre-preparation work

2) In-sales: On-time reporting of production progress

3) After-Sales: Lifetime & 24h technical support


FAQ


Q: How long is the warranty of your equipment?
A: 1 year

Q: Do you supply spare parts?
A: Excellent easy broken parts support for buyers. Easy broken parts guarantee for one year.

Q: Will you provide training?
A: The training is free of charge , and our engineer will be on duty to train your worker.

Q: How will you provide installation&commissioning?
A: Will provide 2~8 persons(adjustable according to the degree of automatic )for installation. Engineers team will go with your project.

Q:How long time for the installation and commissioning?
A: depend on configuration normally only need 15-25 days. Including workers training.
Warmly welcome you contact me for your questions.


0.0174 s.