High quality bottle or canned soda water production line | 3 in 1 carbonated drink filling plant

Share on (1600526149945):


Price:

Quantity:


Product Overview

Description



Product Description




Washing Part
All 304 stainless steel rinser heads, water spray style inject design, more save water consumption & more clean 304 Stainless
steel Gripper with plastic pad, ensure minimal bottle crash during washing


Filling Part
High precision filling nozzle, PLC variable signal control, ensure high filling precision Gravity filling, & filling smoothly &
steadily All 304 stainless steel contact parts & liquid tank, fine polish, easy to clean No bottle no filling


Capping Part
Place & capping system,electromagnetic capping heads, with burden discharge function, make sure minimum bottle crash during capping. No bottle no capping and Automatic stop when lack of bottle


Applicable 
XGF series filling machine suitable for filling water like mineral water,pure water and so on.

The empty bottle come from bottle blowing machine by air conveyor,fist to washing part,and then to filling part by star wheel,and
last to capping part .All the valve are made of stainless steel 316 not sus 304.



Specification


Model
Capacity
Rinsing heads
Filling heads
Sealing heads
Overall dimensions
CGF14-12-5
6000BPH
14
12
5
2400*1900*2800mm
CGF18-18-6
10000BPH
18
18
6
2800*2050*2200mm
CGF24-24-8
13000BPH
24
24
8
3100*2450*2800mm
CGF32-32-10
16000BPH
32
32
10
3700*2750*2900mm
CGF40-40-10
19000BPH
40
40
10
4300*3300*2900mm
CGF50-50-12
21000BPH
50
50
12
5200*3700*2900mm
CGF60-60-15
25000BPH
60
60
15
6300*4400*2900mm


Service


Bottle Design




Factory Layout




Installation and commissioning




Company Profile




FAQ


HOW TO GUARANTEE YOUR FUNDS TO BE SAFE AND DELIVERY TO BE ON TIME?
● Through Alibaba letter guarantee service, it will ensure the on time delivery and the quality of the equipment you want to buy.
● By letter of credit, you can lock the delivery time easily.
● After the factory visit, You can ensure the facticity of our bank account.

HOW TO ENSURE THE QUALITY!
● In order to ensure the accuracy of each part, we are equipped with a variety of professional processing equipment and we have
accumulated professional processing methods over the past years.
● Each component before assembly needs strictly control by inspecting personnel.
● Each assembly is in charged by a master who has working experience for more than 5 years
●After all the equipment are completed, we will connect all the machines and run the full production line for at least 12 hours to ensure the stable running in customers' factory

AFTER-SALE SERVICE
● After finish the production, we will debug the production line, take photos, videos and send them to customers via mail or
instant tools
● After the commissioning, we will package the equipment by standard export package for shipment.
● According to the customer's request, we can arrange our engineers to customers' factory to do the installation and training.
● Engineers, sales managers and after-sales service manager will form a after-sales team, online and off line, to follow the
customers' project.


0.184 s.