Vinyl glove machine automatic glove making machine

Share on (1600533726361):


Price:

Quantity:


Product Overview

Description



Product Overview




Vinyl glove machine automatic glove making machine
The nitrile/latex glove production line uses natural latex or synthetic rubber as the main raw material and other chemicals as auxiliary materials. The hand mold is cleaned with acid and alkali, and then cleaned with water again. Then the cleaned hand mold is first immersed in hot water and heated then immersed into coagulant and dried for dipping. After dipping, go into an oven for preliminary drying, flushed with hot water and then sent to another oven for curing and drying to form. After the gloves are demolded, they are inflated or filled with water for inspection, washed.centrifuged. and dried before packaging and sending them to the finished product warehouse.
nitrile latex glove production manufacturing machine equipment


PRODUCT SPECIFICATIONS


TYPE
Capacity(pieces/hr)
Size
Latex Consumption
DY45
2400-3000
45x1.8x7m
About 0.7tons/day
DY50
3000-3600
50x1.8x8m
About 0.8tons/day
DY80
8100-8500
80x1.8x8m
About 1.8 tons/day
DY100
9600-10200
100x1.8x8m
About 2.5 tons/day
DY110
29000-30500
110x1.8x12m
About 6.6 tons/day
DY120
19000-21000
120x1.8x11m
About 4.4 tons/day
DY140
15500-16500
140x1.8x8m
About 3.5 tons/day
DY180
35000-40000
180x1.8x12m
About 8.2 tons/day


FEATURES AT A GLANCE


Gipping
Load material
Production line


Machine install
Raw materials tank
Nitrile


Hand mold


chain


Technological process












Our Advantages




packaging&shipping




FAQ


Q:Are you a supplier or a manufacturer?
A:We are a very experienced manufacturer. Our company is located in Yantai City, Shandong Province with more than 30 years of foreign trade experience.


Q:Can your equipment meet our specified requirements?
A:Absolutely. We will change the relevant parameters of the equipment according to your requirements, so as to better meet the production requirements of your factory.


Q:How to guarantee quality to customers?
A:We have very strict product quality control links. The quality inspector is a very strict and responsible person. It will
certainly ensure the quality of the equipment.


Q:What payment terms can we use to complete the transaction on time?
A:FOB,CIF,CFR EXW ,etc. 30% before production 70% before shipment, We prefer 100%T/T but also accept L/D ,our machine can be delivered within 30-40 work days per unit. If you want to expedite it we will try our best short of our delivery time




0.1914 s.