Hot Sale Pb free Energy Saving 0603 0805 1206 Red Green Blue Smd Led Chip On Board

Share on (1600538225288):


Price:

Quantity:


Product Overview

Description









Hot Sale Pb-free Energy Saving 0603 0805 1206 Red Green Blue Smd Led Chip On Board




Absolute Maximum Ratings (TSoldering=25℃)


Parameter
Symbol
Rating
Unit
Forward Current
IF
60
mA
Peak Forward Current   (Duty 1/10 @1ms)
IFP
150
mA
Power Dissipation
Pd
140
mW
Operating Temperature
Topr
-40 ~ +85
Storage Temperature
Tstg
-40 ~ +100
Electrostatic Discharge (HBM)
ESD
2000
V
Soldering Temperature
Tsol
Reflow Soldering : 260 ℃ for 10 sec.
Hand Soldering : 350 ℃ for 3 sec.
Note:
The products are sensitive to static electricity and must be carefully taken when handling products.


Electro-Optical Characteristics (TSoldering=25℃)


Parameter
Symbol
Min.
Typ.
Max.
Unit
Condition
Luminous Intensity
IV
450
--------
900
mcd
IF=20mA
Peak Wavelength
λp
--------
632
--------
nm
IF=20mA
Dominant Wavelength
λd
617.5
--------
629.5
nm
IF=20mA
Forward Voltage
VF
1.7
--------
           2.3
V
IF=20mA
Viewing Angle
2θ1/2
--------
130
--------
deg
IF=20mA
Reverse Current
IR
--------
--------
10
uA
VR =5V
1. Tolerance of Luminous Intensity: ±10%.
2. Tolerance of Dominant Wavelength: ±1nm.
3. Tolerance of Forward Voltage: ±0.1V.


Package Dimensions


Note:
Tolerance unless mentioned is ±0.1mm,Unit = mm.






Our Advantages








FAQ




Q:How about the quality of the leds?
A:Please do not worry about the quality. Our company is the main manufacturer of LEDs in China. Our products have exported worldwide since the year 2010.

Q:Do you offer Custom-made ?
A:Yes , we offer this , but we will charge cost for the custom-made samples .

Q:Can I get free sample?
A:Yes, we can offer free sample for you to check before orderas long as you afford the express freight.

Q:What’s the lead time?
A:Samples delivery out in 3-7 working days.Lead time of mass production needs to negotiate, it depends on quantity.

Q:How about the payment terms?
A:Payment terms: TT in advance (30% of deposit before production and 70% balance before shipment). Please note we do EXW/FOB/CNF/CIF/DDU/DDP.




0.2718 s.