OEM/ODM Plaid Fabric Wear Resistant Moisture Absorbing Multi purpose Fabric

Share on (1600542133007):


Price:$2.26 - $2.30

Quantity:


Product Overview

Description





New Products 2022 CHINA Supplier Wholesale 100% Polyester Knitted Border Design Fabric For Mattress


Products Description


Item No.
9B-18-660-400
Width
210-230cm (86" to 90")
Composition
100%polyester
Weight
400gsm
MOQ
500 Meter
Color
same as our picture or as you request
Delivery time
20-25days for one container
Payment term
TT or LC at sight




JACQUARD CRAFT



Double Jacquard process can make the pattern in stereo feeling and aesthetic sense.From classical to Modern,simple to
luxurious,innumerable designs can be showed in fabric




FABRIC FEEL




The knitted fabric can reach all the end-user want.Because of its 3 layer construction,it is very soft,air permeability and
wrinkle-off.


THE ART OF FABRIC

The aesthetic cover fabric changes mattress into a piece of furniture, not the simple bed,let your mattress stand out from the
crowd.


Production Process














Transportation




Recommend Products




FAQ




Q1. Are you a factory or trading company?
we are a factory located in Heshan city (1.5 hours far from Guangzhou).
welcome to visit our factory any time.

Q2. what is your main products ?
Our Main products are Knit mattress fabric , mainly used on MATTRESS and PILLOW.

Q3: What is your advantage?
Competitive price in high quality , and creative designs.
The most important we can do is HALF-VACUUM PACKING to load more quantity and save the sea freight charge.
No other factories can do it like us. Contact me now !!!

Q4. How can I get fabric samples ?
The fabric samples are free of charge . you only need to pay the freight cost.

Q5. Can you make my fabric desighs or patterns ? How long to receive your counter samples?
Sure, we mostly welcome to receive your samples and your new ideas on fabric.
5-7 days to make the counter samples .

Q6: What is your MOQ ?
500meters for one design

Q7. How long time to produce one container ?
20-25days to make ready one container



0.1943 s.