Tin coating plate Best Tinplate Tin Coated Electrolytic T3 T5 DR8 Tinplate Steel Coil for Food Can

Share on (1600544486874):


Price:$595.00 - $758.00

Quantity:


Product Overview

Description





Product Description




Specification


Product Name
Electrolytic Tinplate
Thickness
0.15~0.7mm
width
600-1200mm(6~599mm slit strip acceptable)
Temper
T1~T6,DR7~DR10
Standard:
AiSi, ASTM,,DIN, GB, JIS
Grade:
MR,SPCC SPCD
Tin coating:
1.1~11.2g/m2
Coil weight
1-5tons
Coil id
508/610mm
Surface finish
Bright,Stone,Silver,Matt
Package
Standard Sea Worthy Package
MOQ
1tons
Certificate
ISO,SGS
Delivery time:
Within 25-30days
















Jinan Suorong Trade Co., Ltd. founded in 1997, covers an area of 200,000 square meters, with more than 300 employees, is a company specializing in the metal materials industry.
The company is an agent of Shandong Iron and Steel, Laiwu Iron and Steel, Handan Iron and Steel, Rizhao Iron and Steel, Anfeng Iron and Steel, Baotou Iron and Steel and other steel mills, and has a first-hand source of goods.
Our company mainly engaged in producing and exporting HRC, CRC, Galvanized Coil/Sheet, Galvalume Coil/Sheet, Aluzinc Coil/Sheet, Prepainted Galvanized Coil/Sheet, Prepainted Galvalume Coil/Sheet, Corrugated Sheets, Copper Tube and Copper Bar, Grain Oriented silicon steel, TinPlate, Alloy round bar and Steel Profiles (Steel H Beams, I Beams, Angle bar, Steel Channel, etc.)
Currently the Group holds the Tubes Mill and production lines of galvanized, galvalume, aluzinc and prepainted steel, with the annual production capacity of 3 million tons.
Honesty wins long term cooperation,Welcome to Suorong Steel !










FAQ


Q1: What is your terms of payment? 
A: 30% T/T as the upfront deposit, 70% before delivery. We will show you the photos of products and package before you pay the balance.

Q2: What is the terms of delivery?
A: EXW, FOB, CIF, CFR, DDU

Q3: What is the terms of packing?
A: generally, we pack our goods in bundles or coils with rods or belts, we could also pack the goods as the customers’ requirement.

Q4: What is your delivery time?
A: For stocks, we could transport the goods to loading port within 7 days after we received your deposit. For production period, it usually takes about 15 days-30 days after receiving the deposit.

Q5: Could you produce according to the samples?
A : Yes, we could customer-made by your samples or technique drawings, we could build the mold and fixtures.



0.1511 s.