DC axial fan (20mm - 172mm): 3V / 3.3V / 5V / 12V / 18V / 24V / 36V / 48V all voltages available AC axial fan (60mm - 200mm): 110V / 125V / 220V / 240V AC voltage DC blower (20mm - 120mm): as required EC fan (60mm - 120mm): 110V - 220V
Q1. What is the minimum order quantity for your products?
A1. The minimum order quantity starts from one piece.
Q2. How can we get samples from you?
A2.Samples are available. Normally, we need 2 days to arrange samples. If we have no previous business records with you, we need Charge the cost of boots samples and freight after express delivery.
Q3. When will you send me the parts?
A3. We will receive your payment within 3-5 working days after receiving your payment.
Title goes here.
Semi-Automatic PET Bottle Blowing Machine Bottle Making Machine Bottle Moulding Machine PET Bottle Making Machine is suitable for producing PET plastic containers and bottles in all shapes.
Products Description
Company Profile
Bearing type 1. sleeve bearing (low price): stable sleeve performance and easy installation Service life: 20000h/25 ℃ Warranty period: 1 year 2 . Ball bearing (high price): NMB ball imported from Japan is adopted, which has the characteristics of high quality, low noise and convenient installation. Service life: 50000 hours /25 ℃ Warranty period: 2 years
Shantou Mingshida Electronic Technology Co., Ltd.
We established,we are always focusing on the R&D,production and selling the cooling fans,and committed to becoming the top brand in Chinese cooling fan industry.After years of effort from all the staffs,we had built the good product R&D and production system,such as:Reliability Laboratory,Noise Testing Room,Air Flow&Pressure Testing System,Mold Manufacturing and Plastic Injection
FAQ
1. What's the difference between the sleeve and ball bearing fan?
The ball bearing brand was NMB bearing imported from Japan.The warranty for ball bearing fan is 50,000 hours but sleeve bearing just 20,000 hours.
2. What kind of function can we choose for fan?
Optional function :Auto-restart ,Speed detection,Stoppage Alarm,Waterproof(IP68 optional), PWM function ,Temperature control etc.
3.What's your MOQ and delivery date ?
MOQ 200PCS Sample lead time:3-5 working days Mass production:10-20 working days for off peak season, 1 month for peak season Waterproof fans need 1 more week