Upgrade Turbo Intercooler Pipe Piping Kit for Nissan Skyline R32 R33 GTST R34 GTT 93 98

Share on (1600545902396):


Price:$50.00 - $54.00

Quantity:


Product Overview

Description



Product Description


Upgrade Turbo Intercooler Pipe Piping Kit for Nissan Skyline R32 R33 GTST R34 GTT 93-98
Description
Fmic intercooler with pipe plumbing kit suitable for Nissan Skyline r32 r33 r34 gtst rb20 rb25det
Nissan Skyline FitR32 R33 R34 gtst RB20 RB25DET 93-98
Pipe thickness: 1.8mm
It is as follows. 1 intercooler 600 * 300 * 76
Inlet / Outlet: 2.5''
4 alloy pipes (od: 63mm)
5 silicone hose,
10 clamps
Hardware and vacuum hose shown in the photo.

This pro-series intercooler piping kit is to suit the Nissan Skyline R33 GTS-t. This piping kit replaces the entire factory piping system, and is a must for any circuit or high horsepower street car.

This piping kit is compatible with the most width side inlet/outlet upgrade intercoolers on the market, but will not fit the OEM intercooler. Our unique piping design has a number of benefits; as it's designed to take the shortest route possible across the rocker covers, turbocharger lag is decreased. Also, unlike other conventional piping kits, the short track design route allows the kit to avoid radiant heat from the radiator.

The kit is easy to fit for the mechanically minded, and power gains are noticeable immediately after fitment.
Completely constructed from CNC aluminium mandrel bent piping, this kit prevents any flex or compression under high RPM and boost levels, and the pipes are larger and smoother than the factory piping. Advantages of running an internally smooth hard pipe is that it encourages earlier turbo spool up and better throttle response throughout the rev range.

The piping kit is available in three finishes; raw, polished and stealth black, and the silicone hose is also available in two
colours; blue or black.


Specification


Product name
Turbo Intercooler Pipe Piping
Key words
Intercooler Pipe
Car Model
Nissan Skyline R32 R33 GTST R34 GTT 93-98
Delivery time
10-20 days


Details Images




Company Profile






FAQ


Q1. What is your terms of packing?
A: Generally, we pack our goods in neutral white boxes and brown cartons. If you have legally registered patent,
we can pack the goods in your branded boxes after getting your authorization letters.

Q2. What is your terms of delivery?
A: EXW, FOB CIF, DDU.

Q3. How about your delivery time?
A: Generally, it will take 15 to 20 days after receiving your advance payment. The specific delivery time depends
on the items and the quantity of your order.

Q4. What is your sample policy?
A: We can supply the sample if we have ready parts in stock, but the customers have to pay the sample cost and
the courier cost.

Q5: How do you make our business long-term and good relationship?
A:1. We keep good quality and competitive price to ensure our customers benefit ;
2. We respect every customer as our friend and we sincerely do business and make friends with them,
no matter where they come from.


Recommend Products




0.0225 s.