Full Automatic Manufacturing Baby Wet Wipes Making Machine Production Line

Share on (1600548127580):


Price:$150,000.00

Quantity:


Product Overview

Description




Full Automatic Manufacturing Baby Wet Wipes Making Machine Production Line






Product Description






Product Name
Baby Wet Wipe Machine
Product speed
250-350 cuts/min (3000-4000 pcs/min )
Suitable raw material
air laid paper, spunlace/hot-rolling nonwoven fabric
Folding way
“Z” shape (pop up and non-pop up)
Cutting unite
A.double paper shelvesB.10 lanes or 12 lanes,2 rolls
C.raw material roll width :900~1000mm
Length of wet tissue
140-220mm (setting via touchscreen)
Wet tissue unfolded size
(140-220)×(150-250) (mm,L×W)
Wet tissue folded size
(140-220)×(90-110) (mm,L×W)
Air Supply
0.6-0.8Mpa 0.2m³/min
Air pressure:
0.6-0.8MPA(37KWpump.5.8cube/h)
Machine color:
Customized
Machine direction:
Customized




NO
Discription
Specification
Qty
Remarks
1
PLC
FX3GA-60MT
1
Mitsubishi(Japan)
2
Servo motor(control the distance of tissue
MR-JE-300A
1
Mitsubishi(Japan)
3
Servo motor(receiving tissue)
MR-JE-70A
1
Mitsubishi(Japan)
4
Turbine Worm Reducer Motor
WPDA120-1:10-Y100L2-4
1
3KW Nanjing Utton(China)
5
Inverter
4KW
1
ARTRICH
6
Touch Screen
7inch
1
Wecon
7
Air switch
7
DELIXI
8
Switching power supply
S-200-24
1
Shanghai Mingwei
9
Indicator light
1
DELIXI
10
Emergency stop switch
3
DELIXI
11
Potentiometer
5KΩ
1
12
Rotary encoder
Incremental pole output
1
Koyo(Japan)
13
Relay
Omron
4
Omron(Japan)
14
Proximity switch
Autonics
6
Autonics (Korea)
15
Timing relay
CKHKC
6
China
16
Contactor
3
DELIXI
17
Servo electronic transformer
4.5KW
1
China






Factory




Packing & Delivery




OEM / Customization: Support
Delivery Time: 150 days, or negotiation
Packaging: Wooden case and fixed with iron bar
Payment Method: T/T, L/C
Payment Terms: 30% advance, 70% balance
Port of Shipment: Xiamen port
Transportation Time: 20-45 days (ocean)


FAQ


1. Are you a factory or a trading company?
We are a factory with more than 15 years of experience in sanitary machinery manufacturing.Equipped with R&D technology team, professiona spare parts processing team, assembly team and after service team.

2.What is the delivery time for a set of machine?
180 days after receive deposit & confirm the machine drawing .

3.How long will be the guarantee?
One year machine core components quality assurance, lifelong after-sales service.

Every year we sent more than 100 times technician out all over the world to install the machine or offer service and update the machine for old customers.

4.How many workers are needed for the machine?
7- 10 worker. depending on your packaging method.

5.Will you send the engineers to install machine and train our worker in our factory?
We will dispatch 3 engineers, include mechanical engineers, electric engineers and glue applicator engineers.But the salary and a ccomondation of technician will be on buyer's account.


0.1976 s.