Share on (1600560380584):
Product Description
i9 CPU 15.2w/m-K Water cooler 360 CPU GPU overclocking PC building thermal paste compound 1g
Advantages:
·Extreme performance 15.2W/m-K
· Nano graphene tech
· easy applying( 130 ~150 Pa s)
· perfect for overclocking, liquid cooling solutions, modding
· Non-electronical conductive
· Reliable performance under high temperature





Specifications:
Color: Dark Grey
Density @ 25°C (g/ml): 2.4~2.5
Viscosity @ 1rpm (Pa s): 130 (130,000 m.Pa s)
Thermal Conductivity: 15.2W/m-K
Thermal Impedance: 0.001 ℃ -in/W
Weight Loss after 96 hours @ 100°C: 0.1%
Permittivity @ 106Hz: 2.4
Volume Resistivity: 3.0 x 10 ×(Ohm.cm)
Dielectric Strength: 1.0KV/mm(Non-Electrical Conductive)
Working Temperature: -20~130 degree celsius
Silicone Based
Accessories:
Spatula *1
Cleaning wipe *1
Your best choice heat conductive material for overclocking and liquid cooling
Testing Data:
| Hardware & Software | |||||
| CPU | i9 12900K P-core 5.0 / E-core 4.0 GHz OC | ||||
| Mother Board | GIGABYTE Z690 AORUS MASTER | ||||
| CPU Cooler | NZXT KEAKEN Z63 | ||||
| ROM | KLEVV CRAS C700 M.2 NVMe SSD 480GB | ||||
| Case | CORSAIR 7000D AIRFLOW | ||||
| PSU | CORSAIR HX1000 80PLUS PLATINUM | ||||
| System | Windos 11 Pro x64 | ||||
| Testing Software | AIDA64 | ||||

Packaging & Shipping

Our Services
Our Service
1.Gurantee Period: 5 years
2.Express Door to Door Service
3.Payment: T/T Pay-pal Western Union
4.OEM&ODM
5.Products Exchange & Returns
(you should provide pictures or video or testing data to confirm that it is our products' problem)
Company Information
About US
We, Shenzhen Halnziye Electronics Co., Ltd. are senior Thermal Grease manufacturer in China over 10 years, our main products are heat sink compounds & heat sink plaster & heat sink flow and thermal pad, our products are widely used in CPU&VGA, LED, IC etc, with great operating property of our products (all products got CE, RoHS certification), and our main markets are EU, north America, Northeast Asia, Southeast Asia etc, I believe you will find what you want to order with the best cost performance.
FAQ
FAQ
1>Lead time:
Less than or be equal to 1000pcs In 3 working days;other quantity depends on arranging of our factory.
2>Delivery period: 3~5 working by Express door to door service and airport to airport service, if by ship, it depends on schedule and destination.
3>All Emails will be answered in 12 hours, if you do not receive our reply,please send it again and we will reply as soon as possible.
4>Any other question ,no hesitate to contact us
New products from manufacturers at wholesale prices