S9 35kV 1000 kva transformer 3 phase Oil-immersed Power Transformers with on load tap changer distribution transformer

Share on:


Price:$1,560.00 - $5,800.00
Price in USD:Details

Quantity:


Product Overview

Description


S9-630~31500/35 Three phase high voltage oil-immersed Distribution Transformer


 


 


PRODUCT DESCRIPTION


 


S9-630~31500/35


Three phase high voltage oil-immersed Distribution Transformer


Transformer 32.jpg


The products accord with nation standard of < Power Trans-former GB1094>.<3-PhaseOil immersed Power Transformer Technical parameters and Requirement GB/T6451. The pro-duct function has attains international level, which are improved importantly at material, technique and structure. They have a features of high efficiency, low loss, and saving power & expenses They are new extensively recommend product which welcome to customer.


 


Executive Standard


· GB 1094.1-2-2013 Power transformer


· GB 1094.3-2003 Power transformer


· GB/T1094.4-2005 Power transformer


· GB 1094.5-2008 Power transformer


· GB/T6451-2008 Three-phase oil-immersed power transformer technical parameters and requirements


· The international standard IEC76


 


Type and Signification


Transformer 28


 


Performance Characteristic


Compare S9 series to '8"series product, the S9 series no-load lossdecreased 14. 88%, on-load loss decreased 10. 47%, and the whole lossdecreased 11. 4%. They have a perfect social benefit for the obviously save power.


 


Technical Parameters


Transformer 33.jpg


Note:


1. Can provide an air cooling device on the above 8000KVA transformer.


2. Can provide various Voltage transformers. short circuit impedance, coupling model according to the near demand.


3. Table height and size data for reference only. are subject to change without notice. 


 


ENTERPISE BRIEF INTRODUCTION 


oil-immersed transformer


Haibian Power Equipment Co.,Ltd. is founded in 2009 , specialized in the development, manufacturing, and sales of high voltage power distribution equipment and transformers.With outstanding advantages, the leading SF6 load switches, high voltage ring main units, high voltage switchgears, ring main unit breaker cabinets, cable branch cabinets, and centrally installed switchgears are accredited as domestic leading products by the Zhejiang Science and Technology Department. The company owns independent import and export license and also takes part in the overseas EPC projects, with a subsidiary US-Sino joint-ventured Shanghai Haibian Electric Power Equipment Co., Ltd.


 


Transformer workshop


1.    HV and LV winding


oil-immersed transformer


 2. Silico steel cutting & assembly (core)


oil-immersed transformer


3. Winding & core combined together


oil-immersed transformer


 4. Wing & core wite, cable, conductor assembly


transformer


5. Heating winding & core (12Hours)


transformer


6. At the same time, make transformer shell (iron cutting welding and corrugated refrigeration panels)


transformer


7. Phosphorization transformer shell


transformer


8. Antirust paint (color is deep red)


transformer


9. Put winding & core into transformer shell


high voltage transformer


10. All parts assembly with transformer shell


high voltage transformer


11. High voltage test


high voltage transformer


12. Shell surface paint


high voltage transformer


 


CERTIFICATE 


Certificate750.jpg


 


                 SHIPMENT  &  PAYMENT


 


SHIPMENT&PAYMENT750.jpg


 


FAQ


Q: Can we get a sample for reference?


A: Yes, as long as the goods are conventional type, and you will be charged sample cost plus related shipping cost. Once you place an order to us, we can return or deduct the sample cost to you.


 


Q: How to solve the quality problems after sales?


A: Take photos of the quality problems and send to us for our checking and confirming, we will make a satisfied solution for you within 3 days.


 


Q: What is the lead time?


A: The lead time depends on the quantities ordered, generally within 25-35days upon the receipt of advance payment.


 


Q: What is your terms of payment?


A: We accept West Union, T/T, irrevocable L/C at sight. Prefer T/T 30% deposit before production, the balance against copy of B/L.


 


Q: Can you print our brand on the product?


A: Yes, of course, we also do OEM to print client’s brand on the product


  



 


CONTACT US


 


 


Performance Guarantee



Once u buy the product manufactured by Haibian Power Equipment (CHHP) can get 24 months performance guranantee after delivery date, or if there is any special reques, pls do not hesitate to contact us...





























          
          

 


 













0.07 s.