Liquid Handling Component For PCR/Genetic/Flow Cytometry/Pipetting Platform/Molecular Diagnosis/Laboratory Analyzer Tip Pipette

Share on (1600565183733):


Price:

Quantity:


Product Overview

Description





Product Paramenters


Maximum displacement
1ml
Communication and control
RS-232, RS 485 or CAN
Liquid level detection
Pressure-based detection
Driver design
Hollow cup plus encoder motor plus ballscrew
Weight
330g
Medium temperature
5-40°C
Tip volume
Tip with filter of 10ul/50ul/200ul/300ul/1ml
Power requirement
24V DC
Dimensions
253* 100* 11.9mm
Anticipated life
1 million cycles


ADP (Air Displacement Pipettor) Is A Pipetting Module Developed By Keyto Based On Air Displacement To Aspirate And Dispense Fluids With Disposable Tips. Which Supports Liquid Displacement In The Range Of 2ul To 1000ul With Different Size Of Tips. The Keyto Adp Provides A Fast And Reliable Mechanical Adapter Module, As Well As Common Communication Connection, For Integration In Cross-Contamination-Sensitive Pipetting Platforms And Test Equipment Pipetting Units, Providing A Reliable And High-Performance Pipetting Module For All Types Of Equipment.


Products Description




ANTICIPATED LIFE
Strict inspection procedures, unique seal-
ing scheme, ensure the service life of the
pipettor can reach more than 1 million
times
PRODUCT FUNCTION
It can detect liquid level and clot in high
speed, empty suction error reporting, with
the help of Z axis to achieve the liquid level
following function




Main Products




Company Profile






Certification & Exhibition




Production Process




Packaging & Shipping




FAQ


1.How can I customize my products? 
Attach your drawings with details(Suface treatment,material,quantity and special requirements etc).

2.How long i can get the quaotation? 
We will offer the quotation within 48 hours(Considering the time difference). 

3.Are there any other requirements for the order?
OEM&ODM are welcomed.

4.Can I get a sample for testing?
We will offer free or charged samples depends on the products. 

5.How long will you produce the parts? 
Normally three weeks

6.What's your payment terms?

T/T

7.How about the transportation? 
By sea or by air





0.2065 s.