Share on (1600565202465):
Modular rooms are suitable for long-term parking in fixed locations and can be directly connected to external public power systems and water conservancy systems to supplement the needs. For power hungry areas, the factory can also install and configure the corresponding photovoltaic power generation system for users. Large vehicles can easily move forward when changing places. It is the combination of the convenience of the RV and the comfort of the villa, has the tremendous advantage of durable reuse without occupying construction land. The modular housing has become the best choice for the operators of tourist attractions, holiday resorts, eco-agricultural sightseeing parks and car camps.

Product Name | Modular House | ||||
Structure | I-beam, square steel, glulam | ||||
Exterior wall | Waterproof and breathable membrane, imported fiberboard cement board | ||||
Interior wall | Solid wood, clean taste latex paint, non-toxic and environmentally friendly materials | ||||
Roof | Thick self-adhesive waterproofing membrane, double-layer fiberglass tile | ||||
Door&Window | Broken bridge aluminum profile doors and windows, double glass | ||||
Floor | Structural board (80mm thick insulation board in the middle, 10mm Ozon board on both sides) composite floor | ||||
Water and electricity system | Lines, pipelines concealed, add to the tropics | ||||
Delivery date | 45 days | ||||
MOQ | 1set | ||||


As a composite building material, the SIP board has both load-bearing and thermal insulation (or heat-insulation or heat insulation).
Residential houses built using SIP (load-bearing heat-breaking panels) are different from those built using OSB (Oriented Strand Board), which is generally used as a retaining panel and needs to be nailed to a wooden frame or a light steel frame. The residential building built by SIP, because of its large area and load-bearing performance, does not require special frame system support, and is a frameless building structure.















The progress of order our modular homes.
1. How to buy our modular homes?
A: TT will be more appreciated. 50% deposit before producing, 50% balance before loading by TT.
2. What is the delivery time?
A: It depends on order quantities. Generally speaking, the delivery time will be within 25 to 40 days.
3. How to pack the modular house?
A: We use standard package. If you have special package requirements, we will pack as required, but the fees will be paid by customers.
4. How to install after the goods arriving destination?
A: We will provide detailed illustrations to you. If it is necessary, we will send technicians to help you. However, the visa fee, air tickets, accommodation, wages will be paid by buyers.

New products from manufacturers at wholesale prices