China Manufacturer FRP Material Modular Cooling Towers

Share on (1600566736970):


Price:$450.00 - $500.00

Quantity:


Product Overview

Description



Product Description


Product Features
*Brand
TIANJIN LATINO
*Cooling Type
Modular Cooling Tower
*Model
LTN-2638
*Material Type
Fiber Glass, FRP, GRP
*Cooling Tower Fill
Round PVC Cooling Tower Fill; PP Cooling Tower Fill
*Request Information For Quotation 
Inlet Temp., Outlet Temp., WB Temp., Water Flowing
*Dimension Information
Customized
*Merchnical Part
Motor, Cooling Tower Fan, Gearbox


A modular cooling tower assembly is provided that comprises at least one cooling tower module having extendible legs capable of supporting the assembly when fully extended. When more than one cooling tower module is used in the assembly, adjacent modules are attached together at their respective frames. A single exit plenum chamber is placed over the joined modules and a single fan in the exit plenum chamber causes an air intake from an air entrance plenum chamber at the bottom of the modules upwardly past the cooling tower fill sheets and out the exit plenum chamber and fan cowl. The cooled liquid falls into a common collection basin in which the extended legs of the modules are standing.

Principle of Operation:
Cooling towers reject heat from water-cooled systems to the atmosphere. Hot water from the system enters the cooling tower and is distributed over the fill (heat transfer surface). Air is induced or forced through the fill, causing a small portion of the water to evaporate. This evaporation removes heat from the remaining water, which is collected in the cold water basin and returned to the system to absorb more heat.
There are two main configurations of factory assembled cooling towers: crossflow and counterflow. In crossflow cooling towers, the water flows vertically down the fill as air flows horizontally across. In counterflow cooling towers, the water flows vertically down the fill as air flows vertically up.
.
Advantage

Compact design and easy transport.
Pre-assembled components to minimize installation time and cost.

Reduced field installation time and cost.
While being positioned in the range of large industrial plant coolers, Tianjin Latino installation time is very short.

High efficiency.
Provided by evaporative technology in combination with axial fans.

Efficiency and optimal consumption.
Tianjin Latino solutions are selecterd trough advanced software in order to fit the plant characteristics.

Quick pay-back.
Pre-selection performed together with the client, based on their project requirement




Detailed Images




    • Round PVC Cooling Tower Fill



Cooling Tower Sprinkler
  • Cooling Tower Fan



Hand Lay-up FRP Casing
Available Stock For Cooling Tower
Motor


Installment Pictures




Related Products




Company Introduction


Tianjin Latino Environmental Technology CO.,Ltd is a scientific-oriented economy body integrating with scientific research,
designing, manufacturing, installation and service maintenance, which is originated from European. We, Tianjin Latino are
specialized supply one stop service for the cooling tower parts and cooling tower engineer service.
Tianjin Latino’s main products are cooling tower, cooling tower Film Fill, cooling tower drift eliminator and cooling tower spray system, UPVC distribution pipes, FPR winding pipe, FRP profile parts,FRP gratings, Fan stack, etc. Tianjin Latino's cooling tower and cooling tower parts is being used widely used in the world. Our business involve in UK, Germany, Italy, Belgium, France, Poland, Israel, Russia, Turkey, UAE,IRAN, Malaysia,Philippines, Indonesia, Korea, Japan, Australia, Thailand, India, Singapore and New Zealand, Netherlands,Ukraine, etc..
Tianjin LATINO has an experienced team in quality and project implement to support the purchasing activities of overseas
customers. Based on the superior design , professional service, Tianjin Latino’s cooling tower and cooling tower parts is widely used in the Petrochemical, Petroleum, Power, Metallurgy, Medicine and Rubber Industry, etc..

We aim to help all of the customers choose the suitable cooling tower parts from China with competitive price easily. and have the capacity to support every potential customer to be our sales agent successfully! We have good reputation int the cooling tower industry, based our superior quality, professional service.




FAQ


Q1. What's your Main Product ?
The company's main products are cooling tower and Cooling tower parts such as Film Fill, drift eliminator and spray system, UPVC distribution pipes, FPR winding splash pipe, FRP profile parts, FRP gratings, Fan stack, band & clamp, etc

Q2:How to define the product price?
A: PVC cooling Tower material is based on the thickness,vicat point, color, density,fire classification, packing and quantity.

Q3. Do you keep the stock of your products?
A: Yes, we maintain a certain amount of standard products inventory, in time to meet your needs.

Q4. Whether you have the ability to accept the product customization?
A: Products can be customized, we can make the new thermoforming or extruding mode based on your drawings and we can sign a confidentiality agreement about your patented product, pls contact us for any further information.

Q5: What's your delivery time ?
The delivery time normally will be 10 -30days , the specified delivery date will be according to customer request and order
quantity .

Q6. How to reassure those who doubt the product quality and actual situations?
A professional system can ensure the whole latest development which will be monitored by you through the reports in the
diffferent stages.

Q7.How about your after sale service?
1. Warranty service
a).Warranty: 1 year.
b) .Warranty starting: acceptance date.
2. Service commitment
Warranty period:
a). Our company will be responsible for the quality problems arising from the maintenance, replacement of parts and related materials.
b). Artificial damage will be repaired by our company, but the damaged devices shall be paid.
3. Expiration of the warranty period:
a). Our company provides lifelong maintenance, but the user is responsible for the cost of labor and material.
b). Our company also provides charging upgrades and improvements following to the customer's requirements.


0.186 s.