Low Mild MS Carbon SPCC SPCD ST37 Mild Carbon Steel Coils Strips For High Strength Structure

Share on (1600567605879):


Price:$790.00 - $820.00

Quantity:


Product Overview

Description



Details Images




ASTM a36 grade 12mm 16mm MS carbon iron coil hot rolled steel coils S235jr HR steel coils for Heat Exchangers


Product Name
Carbon Steel Coils
Length
5.8~12m,or as required
Width
0.6m, or as required
Thickness
0.1~300mm,or as required
Technique
Hot rolled
Material
Q345B,Q345C,Q345D,Q345E,Q390,Q390B,Q390C,Q390D,Q390E,Q420,Q420B,Q420C,Q420DQ420E,Q460,Q460D,Q500C,Q500D,Q500E,Q550C,Q550D,Q550E,Q620C,Q620D,Q620E,Q690A,Q690B,Q690C,Q690D,Q690E,Q690D,Q690C,Q890C,Q890D
16Mo3,16MnL,16MnR ,16Mng,16MnDR、HG785D,S690QL,50MN
Application
It is mainly used to make structural parts such as car girder, beam, transmission shaft and car chassis parts, which can reduce
the weight of the parts.
MOQ
25tons.We also can accept sample order.
Shipment time
Within 15-20 workdays after receiving deposit or L/C
Export packing
Waterproof paper, and steel strip packed.
Standard Export Seaworthy Package.Suit for all kinds of transport,or as required
Capacity
250,000 tons/year








Carbon steel is extremely strong and shock resistant. This makes carbon steel coil a popular choice for construction, piping and to support modern roads. This type of carbon steel coil is also not prone to rotting as many other metals are. Safe -Compared to many other materials, steel is safe to handle and work with.








Liaocheng Luxi Donghua Foreign Trade Co., Ltd. is located in the seamless steel pipe distribution center-Liaocheng, Shandong. The company was established in June 2008, focusing on the operation of seamless steel pipe series products, mainly engaged in Panjin, Metallurgical Steel, Xinpengyuan, Tianjin The products of steel mills such as Datong, Yanbao, Tianhuai, etc. The materials include 20#, Q345B, 16 manganese, 45#, 15CrMo, 12CrMoV, etc., based in Shandong, the products are exported to all parts of the world, with a total of more than 80 employees, the company has cooperated with Many steel mills have established long-term and stable cooperative relations. Seamless pipes, seamless steel pipes, and seamless pipe steel pipes have passed the ISO9001 quality certification, ISO14001 environment, OSHMS occupational safety and health management system certification and API international product quality certification. And taking advantage of self-export rights, the products have been exported to many countries and regions such as the United States, South Korea, Canada, and India. At present, the company has tens of thousands of customers, and has achieved an annual sales volume of 200, 000 tons.










FAQ


Q1: Are you a trader or manufacturer?
A1: We are the professional manufacturer with 22 years experience, located in Wuxi and Liaocheng City which is a famous
stainlesssteel production base. Welcome to our factory and showroom before you place order.

Q2: What's the annual output?
A2: We can produce more than 31,000 tons stainless steel tubes in a year.

Q3: What is your welding method?
A3: All of our tubes are welded by TIG welding methods. Our tubes can get fully welding and smooth inner welding, without
blisters, leak welding or black line. All of our tube are good for tube bending.

Q4: How do you control the quality during the polishing process?
A4:
1)As for the mirror polish square/rectangular tube, we will polish it as least four times.
2)During the polishing processing, we set a special sanding wheel to polish the welding part.
3)To avoid scratches, after polishing, the tubes will be lay out on a steel crate then we could lift the whole steel crate
instead of the tube.
4)On the other hand, we use the gunny bags to protect the tube's surface when the tube laying-out.

Q5: How do you inspect the pipes?

A5: The Quality inspectors inspect the tubes during each production processes from raw material, tube welding, polishing,
packaging.
1) Before the production of each machine, we will have the first checked and record the data.
2) During the production, our inspector and engineer have been carefully moniting and we record the data every two hours.

Q6: What is the MOQ?
A6: 1 ton.

Q7: What’s the delivery time for the tubes normally in your company?
A7: 20-30 days for 1-4 containers base on the how many items.

Q8: What payment terms you can deal with?
A8: Mostly we deal with TT terms and L/C,for L/C we need to know which bank to open the L/C and after checking the bank information to decide whether to accpet the L/C.If you have other preference, please negotiate.


0.182 s.