Smart fruits juice production line large capacity fruits juice production line

Share on (1600574528107):


Price:$12,000.00

Quantity:


Product Overview

Description



Product Description


Smart fruits juice production line large capacity fruits juice production line

Fruits juice processing line: natural fruit juice production line (fruit as raw material), with pulp juice production line, the
deployment of fruit juice production line (concentrated fruit juice as raw material).

Production process: fruit processing including fruit juice or selection of cleaning and conveying, beating extraction (equipment should be a reasonable choice of equipment according to the fruit and the product characteristics), clarifying and filtering, mixing, homogenizing, degassing, sterilizing, filling, after sterilization, drying, labeling, inspection, marking, packing (heat shrinkable film packaging), storage.

Production equipment including: reverse osmosis pure water machine, water tank, pressure system, fruit washing machine, fruit picking machine, crushing machine, juicer, beater, enzyme killing machine, centrifugal filter, storage tank, mixing tank, homogenization, degassing machine, UHT sterilization machine, filling machine (according to the packing form different filling machine), sterilization machine, labeling machine, printing machine, heat shrinkable film packaging machine, CIP online cleaning system etc..

Technical features:

Raw materials: apple, peach, pear, mango, pineapple, etc..

Finished products: fresh fruit juice, fruit juice drink, pulp beverage,

Production capacity: 2 tons / day -500 tons / day

Packing: PET bottles, cans, glass bottles and other aseptic brick.



Our Service


Pre-Sales Service

* Inquiry and consulting support. 

* Sample testing support. 

* Accurate quotation and technology analysis.

* Suggestions for related products and projects.

* View our Factory.

After-Sales Service

* Help installation and training.

* Technical support online all the time

* Repair or change new spare parts

* Employee working at factory long term

* Improve technology and equipment design for buyers



Packing & Delivery


Packaging
Size
2500*1200*1500MM
Weight
1500KG



Packaging Details
The normal package is wooden box shipping by LCL, and loading containers at our factory by FCL directly,  or pack it according to customers special request.









Customer Photos




Client from Pakistan
Client from Senegal
Client from Cameroon


Certificates




complete layout of workshop
complete processing line:
cleaning-grading and steaming-shelling-drying and humdifier-peeling and grading-sorting-cleaning-picking-sterilizing-flavoring and packing machine
layout of automatic shelling line
automatic shelling and separating line are composed of more than 20sets of single machines and accessories. elevators, shelling, vibrator sieve, centrifual separator, blowing separator, rolling separator, etc.
layout of automatic peeling line
automatic peeling line is composed of hopper, elevator, brushing, peeling ,drum grading and rolling grading machine. peeling rate and whole kernels rate are 90-95%. work with screw air compressor.


FAQ


What would be the min. And max. Lifetime of the production lines and do they have examples from the past?
at least 10 years. Some Client for Kenya brought 12 sets machine in 2010, including semi- automatic shelling machine, and other single machines. Except for supply of spare parts with the initial shipment, there were only extra 2 shipments by DHL for spare parts during their usage till now.


What package can be provide, e.g. besides the sole equipment supply also things like installation/supervision, staff training, service & maintenance?
We shall send two-three technicians to the site to provide guidance on installation and debugging and the training of operators. The technicians’ round-trip air tickets, visa application fees and personal insurance are paid by the customer. Besides, the customer should provide free accommodation for the technicians while they are abroad. The customer should pay each technician 100usd/day.


What is the spare part supply and how long will spare parts be available? Would a supply of parts that have a higher wear & tear (according to their experience) be possible already with the initial shipment?
Lead time of spare parts: 7-15 days
Transportation way: By DHL.
We would have a supply for the parts of higher ware & tear with the initial shipment for free, the quantity as per corresponding sets of equipment.


Contacts






0.0839 s.