Product Overview

Description





Product Description




Product Name
Gypsum Powder Production line
Annual capacity
15,000 to 500,000 tons
Working time
24h/day ,300day/year
Raw Material Gypsum Type
Natural gypsum ore
Gypsum powder Mesh
Within 220 meshes
Heating method
Hot air boiling furnace or rotary kiln
Application of the powder
Building material like to produce gypsum board ,
To make plaster of paris , to make gypsum cornice or ceiling
Degree of automation
Fully automatic
Final product specification
Gypsum powder
Fuel for the heating system
Natural gas,coal,diesel,heavy oil,light oil etc
Finished powder bending strength
2.7 Mpa
Finished powder compressive strength
5 Mpa





Features of this hot air boiling furnace technology

1-Reduce investment

2-Reduce maintenance cost

3-Gypsum powder quality adjustable

4-The installation period is short and area is small

5-energy and power saving


Our chief engineer is very famous in the gypsum field in China, and his technology is recognized as good in the gypsum powder
industry, especially in the chemical gypsum field.
He has participated in the construction of almost all gypsum projects with large production capacity in China, especially for the
largest project with an annual output of 400,000 tons. There is no other person in China who has the mature technology.

The most advanced gypsum powder hot air boiling technology is invented by him, and has obtained a patent. The technology is the
most advanced and mature technology in the field of gypsum powder in China.
The latest technology has four projects in Indonesia, two in Uzi, Turkey, Thailand and South Africa.


Project Case


Case 1:
Project name:Natural gypsum powder&board project

Project capacity:
Gypsum powder line: 150000 ton
Gypsum board line : 10 Million sqm/year

Project technology:hot air technology

For this project, our Chief engineer has only taken 5 days to run the whole gypsum powder production line and put it into
production after installation, and our customer also felt surprised on it.


While some manufacturers need more than one month to finish it or even some are unable to run it for production.


Case 2:
Project name: Gypsum powder&board project

Project capacity: 4 factory ,8 lines totally

In 2008 year: gypsum powder line 50000 tons/year + gypsum board line 8000000 m2/year
In 2009 year: gypsum powder line 150000 tons/year + gypsum board line 10000000 m2/year
In 2012 year: gypsum powder line 150000 tons/year + gypsum board line 10000000 m2/year
In 2018 year: gypsum powder line 300000 tons/year + gypsum board line 20000000 m2/year

Since 2008, the boss purchased 4 gypsum powder projects from us, with capacities ranging from 50,000 tons/year (2008) to 300,000
tons/year (2018).
He has now grown to become the largest producer of gypsum building materials in Indonesia, and the quality of his gypsum powder
can compete directly with the local Knauf factory and even sell at a higher price.




Case 3:

Chemical gypsum powder&POP project

This is our chemical gypsum powder project in South Africa. The customer is a well-known local building material supplier. The
owner has been in the phosphogypsum industry for more than 40 years.

project capacity:
Gypsum powder line: 50000 tons/year
Plaster of Paris line: 30000ton /year




Case 4:

project name:Chemical gypsum powder&POP project
project capacity:400,000 tons/year-500,000ton /year 3-project
technology:hot air boiling furnace technology

This project is one of our domestic projects with a large capacity of 400,000 tons. The raw material is chemical gypsum powder,
and use the production process of hot air boiling furnace. This customer's factory is only 1 hour away from our company, and now
he is currently building a second production line and its annual production capacity can be 500,000 tons.
Actually we have succeeded more than 40 similar projects in our country.


What we can help


If you start a gypsum project, what supports you could get from us?



Company introduction






Our service


1-Rich experience :
1) Experience in gypsum technology research since 1998
2) Experience of 100+ projects manufacture &install abroad and domestic

2-Professional team
1) Experts provide professional design for the project
2) Market dept. members provide professional and efficient communication
3) Experienced installation group gets projects into production quickly.
4) the Whole group provide a powerful One-stop sourcing service

3-Full range of services
1) Pre-sales: full cooperation with pre-preparation work
2) In-sales: on-time reporting of production progress
3) After-Sales: Lifetime & 24h technical support

4-Irreplaceable advantages
1) Case projects visiting abroad on-site & online
2) Training to workers & engineer


FAQ


1.
Could you dispatch engineers to my plant for installation?
Yes, of cause. Our engineers are in Africa to install 5 production lines now. When they finish the project, will go to Uz.
2.
Could I visit your factory before order?
We suggest you visit our running project abroad. Your could choose the one near to you to visit.
3.
How many days do you need to produce the machines?
Generally need about 60 days
4.
How many days will it take to install the production line?
About 90-100 days to install and try running
5.
Could you help train our workers?
Yes, our engineers will help on training, and will offer you full set of technology documents.


0.0171 s.