2. Uzbekistan project has 2 sets of 35kV high-voltage cabinets and 25 sets of 10kv High-voltage cabinets.
3. 20 sets 20kV high voltage cabinets for Ethiopia project.
4. Nigeria project has 38 sets of low-voltage GCK extraction cabinets and 2 sets of automatic power conversion panels GGD.
5. Sudan project has 32 sets of low voltage cabinets GGD.
6. One set of Siemens electrical PLC control cabinet, one set of Siemens DCS instrument control cabinet, 36 sets of low-voltage cabinets and 26 sets of instrument boxes for 10 ton walking beam furnace of Brazil project.
7. Brazil iron ore project has 5 sets of 35kV high-voltage cabinets, 28 sets of 10kv High-voltage cabinets, 3 sets of PLC control cabinets and 50 sets of low-voltage cabinets.
8. India project has 48 sets low-voltage drawer cabinets GCS and 22 sets non-standard cabinets.
9. Nepal project 20 sets of high voltage cabinets kyn28-12.
10. Tanzania project low voltage cabinet GGD 35 sets.
11. Armenia project has 10 high-voltage cabinets KYN28-12 and 12 sets non-standard cabinets.
12. Uganda Wagagai project has 24sets KYN61 cabinets and kyn28 cabinets, 18 sets GGD cabinets, 12 underground power cabinets, 3 sets high-voltage reactive power compensators, 3 sets DC panel battery panels and 2 sets background operation consoles