Share on:
Sketch:
Double Girder Gantry Crane is more powerful and the gantry crane design is more complex. It is mainly used to lifting heavy loads, with high working strength, in sever working condition, or with other special working demands.
Double Girder Gantry Crane composed of gantry, crane crab, trolley traveling mechanism, cab and electric control system, the gantry is box-shape structure, the track is at the side of each girder and the leg is divided into type A and type U according to user’s requirements.
Double Girder Gantry Crane could be ground control, remote control, cabin control or both, in the cab there are adjustable seat, insulating mat on the floor, toughened glass for the window, fire extinguisher, electric fan and auxiliary equipment such as air condition, acoustic alarm and interphone which can be furnished as required by users.
Feature:
♦ Double girder gantry crane, Compact structure design, Reliable and Trustable
♦ Limit switch for lifting and long traveling, protect from colliding
♦ Improved travel system help double girder gantry crane running more smoothly
♦ Easy and comfortable operation make your working a high efficiency
Details:
Safety Feature:
Shenghua gantry crane(MH,MG) Series is equipped with multiple safety protection devices such as overload, overspeed, anti-slip hook, anti-slip, sound and light alarm, and emergency stop. What's more, in order to ensure the normal operation of the crane, not gnawing rail, to strictly control the installation accuracy of the crane wheel group.
Contact us for more information!
Technical Parameter:
Product Model | SHMG-50 | ||||
Capacity (T) | 50 | ||||
Span (m) | 18 | 22 | 26 | 30 | 35 |
Lifting height (m) | 10/10.94 | ||||
Lifting Speed (m/min) | 5.9/8.5 | ||||
Trolley lifting Speed (m/min) | 38.5 | ||||
Crane travelling speed (m/min) | 40.1 | 44 | |||
Max. Wheel load (KN) | 360 | 380 | 400 | 430 | 450 |
Rail recommended (Model) | QU80 | ||||
Total motor power (KW) | 132.5 | 148.5 | |||
Main dimension (mm) | 18 | 22 | 26 | 30 | 35 |
Rail top to hook center (mm) | 10000 | ||||
Crane base distance (mm) | 8400 | 8500 | |||
Crane width (mm) | 12362 | 12670 | |||
Trolley rail distance (mm) | 7000 | ||||
Hook left limitation (mm) | 5000 | 7500 | |||
Hook right limitation (mm) | 5000 | 7500 | |||
Left cantilever jib (mm) | 8000 | 10500 | |||
Right cantilever jib (mm) | 8000 | 10500 |
Structural Drawing:
Contact us for more parameters and quotation !
Application Scenario:
Henan Shenghua Heavy Crane Group is a professional manufacturer and supplier in China, we can provide most suitable solutions for our clients which includes not only equipment but also engineering services and technical assistance.With our vast offering of valuable features, options, and Customer Care services, you will benefit by reducing operational costs and improving your bottom line. It mainly produces 150 ton concrete T beam launcher, overhead crane and gantry crane, beam launcher, movable scaffolding system crane, form traveller, straddle carrier, tyre transporter, beam trolley, portal crane and electric winch, electric hoist and all kinds of accessories, which widely cover machinery, metallurgy, electric power, railway, water conservancy, ports, terminals and other industries.
Certificates:
Finished Projects:
Contact us to know more about projects!
Customer Visit:
Please click here for more about us!
Contact us and let us serve you better!
Packing methods:
1. Electric parts are packed by high quality plywood crate, to reduce distortion in conveying;
2. Main beams, end beams and electric hoist are packed by plastic woven cloth. It can reduce abrasion when transport.
Delivery methods:
1.If the size of whole 5 ton 25 ton container loading unloading double beam mobile gantry crane are suitable for container ship, usually by container;
2. If the size is too big, usually by bulk ship or by container after truncation
3.Transport ways are based on reducing cost for you and keep the crane performance.
Delivery time:
Within 30 to 40 working days after the receipt of deposit.
Transportation:
generally 35 days to 50 days to destination port.
Click Here to Fill Out Your Inquiry in The Text Box to Get The Latest Quotation!
1. What's the information should I provide when inquiry?
a: Lift capacity. b: Lift height. c: Span. d: Power source. e:Working environment.
More details, more better. If you have the drawing will be very better.
2. Operating methods for selection?
A: Pendent controller with push buttons.B: Remote control with push buttons
C: Cabin control with joystick.
3. Can you provide the various lifting tools?
Sure, we can provide any tools other specials you need, please tell us it when enquiry.
4. How to install 50 ton 100 ton rail mounted double gantry girder gantry crane?
Our senior engineer can be your side to do the installation guide service and training. Moreover, our best sales can visit your country.
5. Safety device of 50 ton 100 ton rail mounted double gantry girder gantry crane.
Overload limiter, Limit Switch (lifting and traveling), Interlock protection device, Buffer, Overhaul cage, Rail clear plate, Protective cover, Bus bar prevent plate, Anticollision device, Main isolating switch, Emergency stop system, Motor overload protection, and so on.