2022 latest design round shape make up cotton pad making machine

Share on (1600596051069):


Price:$13,500.00 - $23,500.00

Quantity:


Product Overview

Description



Product Overview


Round cotton pad machine
Applications:
1. Puts on make-up the cotton and kapok production process: This equipment is divides cuts the good degreasing to lap, the
adhesive-bonded cloth or the gauze, laying aside raw material after the compaction, the heating embosses, rolls cuts process one
time to complete;
2. The main feature The high speed punch press revolving blanking principle of work, the technology is mature, the work is stable,
the service work load are few;
3. Output mode: The pipeline arrangement output, the code falls neatly, the bagging is convenient, a person then operates the
complete machine, big reduced artificial amount of use;
4. The good man-machine operation contact surface, may unfold the real time operation information, is advantageous for the
production monitoring;
5. The mold replacement is convenient, the construction cost is lower than greatly rolls cuts the carving flower cutter bar,
moreover after the mold wears, easy to repair, does not need to discard the replacement, saves the maintenance cost;
6. Put on make-up the cotton and kapok .


FEATURES AT A GLANCE


Voltage:380v
Power(W):5.5kw
Dimension(L*W*H):5000mm*1000mm*2000mm/customized
Weight:2300kg/according to customer
capacity :400pcs/min
Usage:Non Woven Products
Supply type:Make-to-Order



MACHINE SHOW
control system
FINAL PRODUCT




PRODUCT SPECIFICATIONS


No
Item
Data
1
Power
5.5KW
2
capacity
350-400pcs/min
3
weight
2300kgs
4
Dimension of machine
5000mm*1000mm*2000mm


PRODUCT CONFIGURATION


Machine
Final product
Final product


SALES AND SERVICE NETWORK




Successful Project


Project in Thailand
Project in India
Project in Russia


SIMILAR PRODUCTS




FAQ


1. Q: How is the after sales service?
A:We provide 1 year guaranty and technical support lifetime. All machine’s parts can be replaced for free within 1 year if
broken(excluding error operation).

2. Q: Is it difficult to install the machine?
A: The work shop should prepare full facility such as power and air compressor. For the first installation, engineer will be sent
to set machine and do the machine training as long as manual instruction. For the further problems come out, we can provide video
instruction as well.

3. Q: What’s the machine lead time?
A: For the standard machines, we can delivery within 30 days. If it is customized by customer(OEM), the lead time is 35-55 days.