Легкая установка, аксессуары для квадратной бетонной опалубки, зажим для опалубки, регулируемый зажим для колонки (1600606597293)

Share on:


Price:16,50 $ - 18,00 $
Price in USD:Details

Quantity:


Product Overview

Description



Product Overview




Easy Install Formwork Accessories Formwork Clamp Adjustable Column Clamp


Item
Column Size    (width of bar)
Thickness
Weight (kg)
Space of Clamp







Adjustable Column Clamp
150-200 MM [80mm]
5-18mm
15
600MM
200-400 MM [80mm]
5-18mm
20.11
500MM
400-600 MM [80mm]
5-18mm
23.24
400MM
500-800 MM [80mm]
5-18mm
27.14
400MM
500-800 MM [100mm]
8-23mm
48.14
400MM
700-1000 MM [100mm]
8-23mm
55.44
350MM
900-1200 MM [100mm]
8-23mm
62.42
350MM
1100-1400 MM [100mm]
8-23mm
67.94
350MM
1300-1600 MM [100mm+]
8-23mm
86.26
300 MM
1500-1800 MM [100mm+]
8-23mm
116.54
300 MM
1900-2100 MM [100mmm+]
8-23mm
139.34
280 MM
2200-2500 MM [100mm+ ]
8-23mm
201.14
250 MM
2500-3000 MM [100mm+]
8-23mm
224.82
250 MM


Installation:
1. Select column clamp of appropriate size.
2. Assemble steel bar. note the junction head of the parallel bar should in the same
direction.And the first set of clamp shall be 150mm from the ground.
3. Insert the wedge pin into the appropriate slot hole, and use a hammer to knock and fasten to complete the first set of fixation.
4. Refer to the parameter table to install the second set of clamping plates at a proper distance, and repeat the above steps.


Products Description


Adjustable Column Formwork Clamp
1. Grade: Q355B 80MM/100MM
2. Standard: DIN 315.
3. Certification: IS09001, SGS




Advantages:
1.Within 3 meters, no need tie rod, no need to punch on film faced plywood, no need to clean the wall, reduce the repair cost in future.
2.Easy operation, saving labor, can be multi-purpose, solve the diameter change problem.
3. High strength, less accessories,simple procedure, convenient installation and disassembly, high turnover times
4.Quickly achieve fair-faced concrete finishing, one the edge and corner, axis dimension, sectional dimension, perpendicularity, flatness.













Our Factory


Shandong Zeemo Construction Technology Co.,Ltd is a member of Dongstar Group, a multiple industry group in film faced plywood, construction formwork system, scaffolding&accessories. President Wei is nominted as the president of China Shuttering Board Committee.
Our core is integrating these formwork products to compose an optimium solution.
Our intelligent logistic net can deliver products timely&cost effectively. service team will follow all the way.




Packing & Delivery




Packing Details:
1.export package covered with waterproof shrinking film& craft paper, bundle with steel stripes outside.
2. packing in pallet, 50 sets/ pallet or special logistic packing according to customer request.


Delivery Details:
5-10 days after order


COMPLATE PACKAGE
PROFESSIONAL PLACEMENT


Certifications






Customer Photos




FAQ


Q1. What do you do?
A: We manufacture and integrating existing formwork and scaffolding products to compose a optimium solution for pouring concrete
structure in the field of housing, multi-story structure, high rise buildings, towers, sports stadiums, bridges, hydropower
stations, industrial structures etc.
Q2. How many construction projects have you accomplished?
A: 400 both in China and abroad.
Q3. Have you accomplished any landmark?
A: Yes, we have. For example, PAFC (660 meters tall), The 21 Century Building, 2008 Beijing Olympic Main Stadium, CCTV New Site,
Colombo Lotus Tower(Sri Lanka), Hong Kong-Zhuhai-Macau Bridge, Gezhouba Pubugou Hydropower Station etc.
Q4. What can you do for us?
A.We offer our suggestions, drawings of formwork layout, and quotations to the owners, design institutes, or contractors of the
construction projects.
B.We sell our products to the contractors, building companies, or trading companies
C.We support our worldwide peer companies with our outstanding formwork or scaffolding products.
D.We provide remote or on-site instruction to the builders.
Q5. What do you need in order to make a brief design and quotation when we have a construction project to be built?
A: Structural drawing and section drawing.
Q6. How long does it take to make a brief design and quotation after we offer the structural drawing?
A: In general, it takes 5~7 days based on specific requirements of construction project.
Q7. How long dose it take to manufacture the products after the signing of contract?
A: In general, it takes 30~60 days based on the type and quantity of products to be produced.
Q8. Are your products available for leasing?
A: Our products are available for leasing in Indonesia, Singapore, Dubai, Australia, New Zealand. It depends on local relevant
regulations in other countries.


1600606597293
0.0113 s.