API 5L / ASTM A106 / A53 Grad B Seamless Alloy Steel Pipe for Boiler

Share on (1600611503262):


Price:$850.00 - $950.00

Quantity:


Product Overview

Description



Products Description


ASTM A213/A335/A333 Alloy High Pressure Seamless Steel Tubing Pipe (P11/P12/P22/T11/T5)
High pressure boiler tube is a kind of boiler tube, which belongs to the category of seamless steel pipe. The steel pipe is required to have high lasting strength, high oxidation corrosion resistance, and good organizational stability. High-pressure boiler tubes are mainly used to manufacture superheater tubes, reheater tubes, gas guide tubes, main steam tubes, etc. of high-pressure and ultra-high-pressure boilers.


Name
High Pressure Boiler Seamless Steel Tube
Standard
ASTM A213/ASME SA213, ASTM A179/ASME SA179
Material
T5, T9, T11, T22, SA192, SA179
OD
19-426mm
WT
2-25mm
Length
0-28000mm
Surface treatment
solution annealing/Normalization/Tempering










Test requirement
1.100% PMI / SPECTRO CHEMICAL ANALYSIS TESTS 100% PMI
2.100% DIMENSION TESTS & 100% VISUAL EXAMINATION
3.TENSION TEST, FLARING TESTS(FOR SEAMLESS TUBE/PIPE)/FLANGE TESTS(FOR WELDED TUBE/PIPE), HARDNESS TEST, REVERSED FLATTENING TEST
4.100% HYDROSTATIC TEST/100% NON-DESTRUCTIVE TESTS
NOTES : ALL THE TESTS AND INSPECTION NEED TO PROVIDE WITH REPORTS ACCORDING TO STANDARD AND TEST RESULTS.
OPTION TEST & INSPECTION ITEMS:
1.STRAIGHTNESS TEST
2.ROUGHNESS TEST
3.CRYSTALLING PHASE ANALYSIS
4.INTERGRANULAR ATTACK TESTS
5.SHIPPING NOTIFICATION BEFORE SHIPMENT


















Alloy steel pipe
Standard & Mate
GB5310-2013 Standard: 20G,25MnG, 15MoG,15CrMoG, 20MoG, 12CrMoG, 12Cr2MoG, 12Cr1MoVG, 12Cr2MoWVTiB, 10Cr9Mo1VNb, 15CrMoG, 10CrMo910

ASTM A209M/AS-209M Standard: A209T1/SA209 T1, A209 T1b/SA-209 T1b, A209T1a/SA209 T1a
ASTM A213M/ASME SA 213 M Standard: T2, T5, T9, T11, T12, T22, T23, T24, T91, T911, T92, T122

ASTM A333M/ASME SA-333/SA333M Standard: Gr1, Gr3, Gr4, Gr6, Gr7,Gr8, Gr9, Gr10, Gr11

ASTM A334M/ASME SA-334/SA334M Standard: Gr1, Gr3, Gr6, Gr7,Gr8, Gr9, Gr11
ASTM A335/ASME SA335 Standard: P1, P2, P5,P5b, P5c, P9, P11, P12,P21,P22,P23, P24, P91, P92

ASTM A519 Standard: 4118, 4130,4135,4137,4140

ASTM A691 Standard: GRADE 91, CM65, CM70, CM75, CMSH70, CMS75, CMSH80,

ASTM A691 Standard GRADE 1/2 Cr, GRADE 1CR, GRADE 1 1/4 CR, 2 1/4 Cr, 3CR, 5CR, 9 CR

DIN17175 Standard: ST35.8, ST45.8, 15Mo3, 13CrMo44, 10CrMo910, 14MoV63,12Cr1MoV

EN10216-2 Standard: P195GH, P235GH, P265GH, 13CrMo4-5, 10CrMo9-10, 16Mo3, 10CrMo5-5, X10CrMoVNb9-1

JIS G3458 Standard: STPA12, STPA20, STPA22, STPA23, STPA24, STPA25, STPA26

JIS G3441 Standard:SCR420 TK,SCM415 TK, SCM418 TK, SCM420TK, SCM430TK, SCM435TK, SCM440TK.

NF A49-213/215 Standard: TU15D3, TU13CD4-04, TU10CD910, TUZ10CD505
Alloy C276

BS3059 Standard: S1-622-440, S2-622-440, S1-622-490, S2-622-490, S1-629-470, S2-629-470, S2-629-590

BS3604Standard: HFS625 CFS625

BS3606Standard: CFS625
Package
In bundles, plywood cases, wooden cases with water-proof package, etc.
Product processing
Cold drawn
Product origin
China(main land).
Ends
PE, BE.
Trade terms
FOB, CIF, CFR, EXW, etc.




Detailed Images








Factory


Zhongyi Steel Group
1.Stand on the customers' position to design and Sell items.
2.The customer relationship management (CRM)strengthen the service in pre-sales, in-sale and after-sale, help customers solving any questions during using our products, to make customers feel more benefit.
3.Paying high attention to customers suggestion and opinion, According to your finial application of stainless steel,we could advice you the grade and thickness.
4.Laser cutting as your CAD drawing


Zhongyi Steel Group Co., Ltd. Is located in Jinan, the capital city of Shandong province.Our main businesses are :stainless steel plate,coil,pipe,carbon steel, galvanized steel etc. We own our own steel factory which mainly produces seamless pipe, spiral pipe., square and rectangular tube, galvanized pipe and so on. In addition, Huaping also have deeply cooperation with Jinan Steel, Laiwu Steel, Handan Steel, Anyang Steel and Maanshan Steel etc. Our company always focuses on the integration of resources, also with the concept of win-win cooperation. We look forward to be your reliable and quality partner! Respecting customers, providing overestimated products and service is our service concept.




Production Process






Product packaging


To better ensure the safety of AISI 4140 4130 4340 chrome steel 30CrMo alloy steel pipes boiler pipe, professional,
environmentally friendly, convenient and efficient packaging services will be provided.








FAQ


Q1: Are you a trader or manufacturer?
A1: We are the professional manufacturer with 22 years experience, located in Wuxi and Liaocheng City which is a famous stainless steel production base. Welcome to our factory and showroom before you place order.
Q2: What is your major market?
A2: 95% of our tubes exported to more than 86 countries and regions, including Europe, North America, South America, Africa, Oceania and Asia.
Q3: What's the annual output?
A3: We can produce more than 31,000 tons stainless steel tubes in a year.
Q4: What is your welding method?
A4: All of our tubes are welded by TIG welding methods. Our tubes can get fully welding and smooth inner welding, without
blisters, leak welding or black line. All of our tube are good for tube bending.
Q5: How do you control the quality during the polishing process?
A5: 1)As for the mirror polish square/rectangular tube, we will polish it as least four times.
2)During the polishing processing, we set a special sanding wheel to polish the welding part.
3)To avoid scratches, after polishing, the tubes will be lay out on a steel crate then we could lift the whole steel crate instead of the tube.
4)On the other hand, we use the gunny bags to protect the tube's surface when the tube laying-out.
Q6: How do you inspect the tubes?
A6: The Quality inspectors inspect the tubes during each production processes from raw material, tube welding, polishing,
packaging.
1) Before the production of each machine, we will have the first checked and record the data.
2) During the production, our inspector and engineer have been carefully moniting and we record the data every two hours.
Q7: What is the MOQ?
A7: 1 ton.
Q8: What’s the delivery time for the tubes normally in your company?
A8: 20-30 days for 1-4 containers base on the how many items.
Q9: What payment terms you can deal with?
A9: Mostly we deal with TT terms and L/C,for L/C we need to know which bank to open the L/C and after checking the bank information to decide whether to accpet the L/C.If you have other preference, please negotiate.
Q10: Could you print our company logo or information on the tubes plastic bag and the outside package also?Is there extra cost for it?
A10: We can follow customer’s request to print your own information plastic bag for quantity at least 1 container(22-26 tons), and we won’t charge the extra cost.




0.0368 s.